{"id":15017,"date":"2021-09-08T00:00:00","date_gmt":"2021-09-08T00:00:00","guid":{"rendered":"https:\/\/cms.alj3.clients.lemonhq.io\/perspectives\/shuqaiq-3-inovasyonun-sinirlarini-zorlamak\/"},"modified":"2026-05-12T13:31:06","modified_gmt":"2026-05-12T13:31:06","slug":"shuqaiq-3-inovasyonun-sinirlarini-zorlamak","status":"publish","type":"perspectives","link":"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/perspectives\/shuqaiq-3-inovasyonun-sinirlarini-zorlamak\/","title":{"rendered":"Shuqaiq 3: inovasyonun s\u0131n\u0131rlar\u0131n\u0131 zorlamak"},"content":{"rendered":"<p><em>The Shuqaiq 3 desalination plant in Jizan province in south-west Saudi Arabia will be one of the largest Reverse Osmosis (RO) desalination plants in the world when complete in the fourth quarter of 2021.<\/em><\/p>\n<p><em>Awarded to <\/em><em>a consortium of <\/em><a href=\"https:\/\/www.almarwater.com\/\"><em>Almar Water Solutions<\/em><\/a> <em>(through <\/em><a href=\"https:\/\/alj-enterprises.com\"><em>Abdul Latif Jameel Enterprises<\/em><\/a><em>), <\/em><a href=\"https:\/\/www.acciona.com\/es\/\"><em>Acciona<\/em><\/a><em>, <\/em><a href=\"https:\/\/www.marubeni.com\/en\/\"><em>Marubeni Corporation<\/em><\/a><em> and <\/em><a href=\"https:\/\/www.linkedin.com\/in\/rawafid-holding-423704140\/?originalSubdomain=sa\"><em>Rawafid Alhadarah Holding Co<\/em><\/a><em>, its <\/em><em>450,000 cubic meter daily production capacity from this US$ 600m infrastructure investment will guarantee the supply of drinking water to over 1.8 million citizens, while also contributing to economic and industrial development both locally and nationally. <\/em><\/p>\n<p><em>Recognized throughout the water industry as one of the most complex and innovative plants of its kind, in September 2019 it was named the \u2018<\/em><a href=\"https:\/\/www.alj.com\/en\/news\/shuqaiq-3-desalination-project-receives-the-utilities-project-of-the-year-award\/\"><em>Utilities Project of the Year<\/em><\/a><em>\u2019 at the Middle East Energy Awards 2019, held in Dubai, UAE, cementing its status as one of the flagship new infrastructure projects in the region. \u00a0Despite COVID-19, the project has managed to stay on track, with procurement and engineering kept on time and a very impressive \u2013 and ongoing \u2013 site safety record.<\/em><\/p>\n<p><em>As part of a series of interviews with people involved in the project,<\/em> <a href=\"https:\/\/www.linkedin.com\/in\/luis-morales-98710750\/\"><em>Luis Morales<\/em><\/a><em>, Technical Director at Shuqaiq 3, <\/em><em>discusses the complexities of the development and how the team has successfully kept the project on track despite unprecedented global disruption.<\/em><\/p>\n<h2>How has progress been so far and what have been the biggest technical challenges you\u2019ve had to address?<\/h2>\n<p>Technically speaking, the biggest challenge was minimizing the electrical consumption and optimizing the energy efficiency of the plant, not only for the construction and operation, but for the tender to be competitive enough to be awarded the project in the first place. \u00a0We\u2019ve worked closely with vendors and suppliers to find the best equipment with the lowest energy consumption, as well as with the engineers to implement a design which could optimize the process. \u00a0It was the only way we could build a strong enough competitive position to win the tender. \u00a0Now we have a plant which is highly optimized and respects the environment, which is extremely important to us.<\/p>\n<h2>How was the progress of the project effect by the COVID-19 pandemic?<\/h2>\n<p>It won\u2019t surprise you to know that the pandemic had a big impact on our progress. \u00a0We faced a lot of potential delays. \u00a0To avoid these delays, we were very proactive, and we worked with our contractors to develop different solutions. \u00a0For example, we changed the process for installing the intake. \u00a0We had originally planned to construct the intake from the sea to the shore. \u00a0But we switched it around and built it from the shore to the sea instead, which meant we could start taking in water even before finalizing the works. \u00a0To do that, we had to change a lot of processes, such as providing new launch areas where the welding team could work on the pipes, and that was very challenging.<\/p>\n<div id=\"attachment_92161\" style=\"width: 2570px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-92161\" class=\"size-full wp-image-92161\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-Ariel-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1919\" \/><p id=\"caption-attachment-92161\" class=\"wp-caption-text\">Aerial view of the Shuqaiq 3 seawater inlet pipes, each 2m in diameter.\u00a0 Photo Credit \u00a9 Abdul Latif Jameel Energy\/Almar Water Solutions<\/p><\/div>\n<h2>You mentioned the importance of making this plant as energy efficient as possible. How did you achieve this?<\/h2>\n<p>Energy efficiency was essential to our bid. \u00a0To achieve it, it\u2019s not enough to simply ask a supplier for a more efficient pump or a better motor. \u00a0We had to be a lot more innovative in terms of the processes themselves. \u00a0We adapted our designs to reduce energy consumption. \u00a0We worked with membrane suppliers to adapt the membranes so they would function more efficiently in deep seawater, for example. \u00a0We designed a system that uses high pressure pumps installed in a \u2018frame\u2019, rather than individually. \u00a0This allows us to manage all the pumps at the same time, which significantly improves efficiency. \u00a0We use a two-pass process for the water, whereby it passes through the membranes twice. \u00a0By carefully analyzing the data, we can tweak this process to find the perfect distribution between the first and the second pass to improve efficiency even more.<\/p>\n<p>In addition, we worked with our technical specialists to reduce the water pump pressure from 4.5 bars to 3.9. This may not seem like a lot, but in terms of the amount of water we produce &#8211; 450,000 cubic meters &#8211; this small reduction in pressure results in very big gains in energy efficiency.<\/p>\n<h2>Does Almar Water Solutions have strong expertise and experience to enable it to innovate in this way?<\/h2>\n<p>Yes, we\u2019ve previously worked on projects all over the world and we\u2019ve been able to use the experience and knowledge we\u2019ve gained to benefit Shuqaiq 3.\u00a0 Also, the strong relationships we have built up over the years with vendors and suppliers helps us keep on top of the latest innovations and techniques.<\/p>\n<div id=\"attachment_92168\" style=\"width: 2570px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-92168\" class=\"size-full wp-image-92168\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-Overview-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1919\" \/><p id=\"caption-attachment-92168\" class=\"wp-caption-text\">Aerial view of the Shuqaiq 3 construction site. Photo Credit \u00a9 Abdul Latif Jameel Energy\/Almar Water Solutions<\/p><\/div>\n<h2>Shuqaiq 3 uses Reverse Osmosis technology to produce desalinated water. Were other technologies considered?<\/h2>\n<p>In this case, the tender documents specified reverse osmosis, so we did not have any say in which technology was used. \u00a0But even if we did, we would have chosen Reverse Osmosis because it\u2019s the most efficient and the best technology currently available for desalinating seawater.<\/p>\n<p>There are other technologies, but they tend be older and less efficient, whereas Reverse Osmosis is getting more efficient and more competitive all the time.\u00a0 There is a lot of investment into new materials, new solutions and techniques for improving the efficiency even further.\u00a0 It\u2019s quite exciting to see how the technology develops over the next few years.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-92154\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Luis-Morales-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1707\" \/><\/p>\n<h2>There are already two other water plants in that location, Shuqaiq 1 and Shuqaiq 2. The new plant sits between them. Did this present any additional challenges?<\/h2>\n<p>Yes, it did, principally one of space. \u00a0On shore, we have plenty of space, but offshore, the amount of space is more restricted. \u00a0The intakes from the other two plants lie on both sides of our plant, so we had to be very careful during the marine works.\u00a0 That was probably the most technically challenging aspect of the construction, not only because it is 1.5km of pipe installation, but also because we have to be sure that we are not impacting the intakes of Shuqaiq 1 and 2 during our marine works.\u00a0 We put in place strict control measures to avoid increasing turbidity in the water, for example. \u00a0Shuqaiq 2 also produces power as well as water, so there are quite a lot of ship movements in and out, bringing in fuel, oil and so forth, which also created additional challenges.\u00a0 We have a good relationship with both our neighbors, so it wasn\u2019t a problem, but we had to be very careful at all times.<\/p>\n<h2>The plant is on the shores of the Red Sea. What is the water like in that area?<\/h2>\n<p>The water in the Red Sea is beautiful, but it is warm and very rich in organisms. \u00a0It is fantastic in terms of biodiversity but makes the desalination process more difficult. \u00a0We are working with an average water temperature of around 30 degrees and the high level of biological growth is dangerous for the process. \u00a0We have to constantly monitor and control this risk.\u00a0 On the other hand, the turbidity is good, which is an advantage. \u00a0However, we knew this from the outset and, thanks to our strong relationships with the other plants nearby, we have been able to learn from their experiences to implement effective solutions to these problems. \u00a0For example, to minimize biological growth (biofouling with algae, etc.) we are implementing a so-called \u2018pigging system\u2019. \u00a0This is where we use pressurized water to fire a plastic \u2018bullet\u2019 along the pipes to clean the biological growth off the inside, so we can maintain a consistent volume of water in the intake. \u00a0We have also been working with the membrane supplier to ensure we can maintain productivity at this water temperature and avoid any potential risk of damaging the membranes.<\/p>\n<h2>Membranes are a crucial part of the desalination process. How many membranes do you use?<\/h2>\n<p>Our process uses around 54,000 membranes in two passes: 41,000 in the first and 13,000 in the second. \u00a0Each membrane is around 1m in length, so we are talking about 54km of membranes in total.<\/p>\n<div id=\"attachment_92182\" style=\"width: 2570px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-92182\" class=\"size-full wp-image-92182\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1707\" \/><p id=\"caption-attachment-92182\" class=\"wp-caption-text\">The Reverse Osmosis pressure vessels at Shuqaiq 3.\u00a0 Photo Credit: \u00a9 Abdul Latif Jameel Energy\/Almar Water solutions.<\/p><\/div>\n<h2>How does the productivity of Shuqaiq 3 compare to previous generations of desalination plants?<\/h2>\n<p>In the 2000s, plants usually produced between 50,000 cubic meters and 100,000 cubic meters. \u00a0By the 2010s, this had increased to around 200,000, with the biggest one in the world achieving 400,000 cubic meters.\u00a0 Shuqaiq 3 is 450,000 cubic meters \u2013 so even bigger than the then biggest to date and still probably in the world top 10 of commissioned plants.<\/p>\n<p>They are building some other huge plants in Saudi Arabia, but even when they are completed, Shuqaiq 3 will still be in the top 5 biggest plants in terms of production capacity.<\/p>\n<h2>Almar Water Solutions is part of a consortium of partners developing Shuqaiq 3. How important is a partnership approach in a project like this?<\/h2>\n<p>I think it is essential. \u00a0In our consortium, Almar has the technical knowledge, expertise and previous experience of this kind of development. \u00a0But a project like this is about much more than construction.<\/p>\n<p>It needs finance expertise, project management, investment, operations, and so on. \u00a0Working with other partners means the consortium benefits from bringing in all these other complementary areas of expertise. \u00a0And our partnership has worked well. \u00a0We have built strong relationships within the consortium, and this has benefitted the project enormously.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-92175\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-Site-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1707\" \/><\/p>\n<h2>Environmental issues have become much more important in recent years. What measures are being taken to minimize the environmental impact of Shuqaiq 3?<\/h2>\n<p>Optimizing the sustainability of the plant is something that fully aligns with own values and way of doing business at Almar Water Solutions.\u00a0 We want to respect the environment at every stage, not only during construction, but also during operation. \u00a0We have implemented a number of measures and technologies to help us achieve this. \u00a0For example, this plant has a sludge treatment facility to treat all the material we remove from the seawater during desalination. \u00a0Not all desalination plants have a facility like this. \u00a0It means that all the waste we produce is innocuous and not harmful to the environment.<\/p>\n<p>The pigging system we use to clean the inside of the pipes is also environmentally friendly. \u00a0It is a mechanical cleaning system, which means we can avoid using chemicals to clean out the intake pipes and intake tower, so we can limit the amount of hypochlorite we use.<\/p>\n<p>Finally, during the construction phase, we are using strategies that are more respectful to the marine environment. \u00a0For example, when we buried the pipes in the sea floor, we removed a lot of mud. \u00a0But instead of just dumping this mud somewhere else and disrupting the marine environment, we used sucker dredgers to take this material out of the sea.\u00a0 We store it. \u00a0We dry it, and then we use it to backfill the pipe trenches \u2013 so essentially, we are putting it back in the location it came from. \u00a0Similarly, with the brine from the desalinated water, we disperse it back into the sea at various points along a 200 meter pipe, so it disperses very quickly in the ocean and does not overload one particular area.<\/p>\n<p><iframe loading=\"lazy\" src=\"\/\/www.youtube.com\/embed\/KITq7UXrWQE\" width=\"560\" height=\"314\" allowfullscreen=\"allowfullscreen\" data-mce-fragment=\"1\"><\/iframe><\/p>\n<h2>You have worked on previous Almar projects. How does this one compare to others you have worked on?<\/h2>\n<p>I\u2019ve worked on previous Almar projects in other locations, and also for other projects around the world in my previous lives. \u00a0Each one is very different, depending on the local circumstances.\u00a0 Shuqaiq 3 is probably the most memorable because it\u00a0 had the added complication of the COVID-19 situation, particularly from March to September 2020.\u00a0 There were curfews, delays in supplies, people couldn\u2019t travel.\u00a0 It was a very difficult at time, but I\u2019m very proud that we made it through successfully and kept the project moving forward to meet its key dates.\u00a0 The main key date now is the commissioning date at the end of October 2021, but I\u2019m confident we will achieve it.<\/p>\n","protected":false},"featured_media":15008,"menu_order":0,"template":"","class_list":["post-15017","perspectives","type-perspectives","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Shuqaiq 3: inovasyonun s\u0131n\u0131rlar\u0131n\u0131 zorlamak - Abdul Latif Jameel<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Shuqaiq 3: inovasyonun s\u0131n\u0131rlar\u0131n\u0131 zorlamak - Abdul Latif Jameel\" \/>\n<meta property=\"og:description\" content=\"The Shuqaiq 3 desalination plant in Jizan province in south-west Saudi Arabia will be one of the largest Reverse Osmosis (RO) desalination plants in the world when complete in the fourth quarter of 2021. Awarded to a consortium of Almar Water Solutions (through Abdul Latif Jameel Enterprises), Acciona, Marubeni Corporation and Rawafid Alhadarah Holding Co, [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/perspectives\/shuqaiq-3-inovasyonun-sinirlarini-zorlamak\/\" \/>\n<meta property=\"og:site_name\" content=\"Abdul Latif Jameel\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-12T13:31:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/perspectives\/shuqaiq-3-inovasyonun-sinirlarini-zorlamak\/\",\"url\":\"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/perspectives\/shuqaiq-3-inovasyonun-sinirlarini-zorlamak\/\",\"name\":\"Shuqaiq 3: inovasyonun s\u0131n\u0131rlar\u0131n\u0131 zorlamak - Abdul Latif Jameel\",\"isPartOf\":{\"@id\":\"https:\/\/10.0.2.222\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/perspectives\/shuqaiq-3-inovasyonun-sinirlarini-zorlamak\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/perspectives\/shuqaiq-3-inovasyonun-sinirlarini-zorlamak\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg\",\"datePublished\":\"2021-09-08T00:00:00+00:00\",\"dateModified\":\"2026-05-12T13:31:06+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/perspectives\/shuqaiq-3-inovasyonun-sinirlarini-zorlamak\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/perspectives\/shuqaiq-3-inovasyonun-sinirlarini-zorlamak\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/perspectives\/shuqaiq-3-inovasyonun-sinirlarini-zorlamak\/#primaryimage\",\"url\":\"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg\",\"contentUrl\":\"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg\",\"width\":2560,\"height\":1707},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/perspectives\/shuqaiq-3-inovasyonun-sinirlarini-zorlamak\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/10.0.2.222\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Shuqaiq 3: inovasyonun s\u0131n\u0131rlar\u0131n\u0131 zorlamak\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/10.0.2.222\/en\/#website\",\"url\":\"https:\/\/10.0.2.222\/en\/\",\"name\":\"Abdul Latif Jameel\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/10.0.2.222\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Shuqaiq 3: inovasyonun s\u0131n\u0131rlar\u0131n\u0131 zorlamak - Abdul Latif Jameel","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"tr_TR","og_type":"article","og_title":"Shuqaiq 3: inovasyonun s\u0131n\u0131rlar\u0131n\u0131 zorlamak - Abdul Latif Jameel","og_description":"The Shuqaiq 3 desalination plant in Jizan province in south-west Saudi Arabia will be one of the largest Reverse Osmosis (RO) desalination plants in the world when complete in the fourth quarter of 2021. Awarded to a consortium of Almar Water Solutions (through Abdul Latif Jameel Enterprises), Acciona, Marubeni Corporation and Rawafid Alhadarah Holding Co, [&hellip;]","og_url":"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/perspectives\/shuqaiq-3-inovasyonun-sinirlarini-zorlamak\/","og_site_name":"Abdul Latif Jameel","article_modified_time":"2026-05-12T13:31:06+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"1 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/perspectives\/shuqaiq-3-inovasyonun-sinirlarini-zorlamak\/","url":"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/perspectives\/shuqaiq-3-inovasyonun-sinirlarini-zorlamak\/","name":"Shuqaiq 3: inovasyonun s\u0131n\u0131rlar\u0131n\u0131 zorlamak - Abdul Latif Jameel","isPartOf":{"@id":"https:\/\/10.0.2.222\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/perspectives\/shuqaiq-3-inovasyonun-sinirlarini-zorlamak\/#primaryimage"},"image":{"@id":"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/perspectives\/shuqaiq-3-inovasyonun-sinirlarini-zorlamak\/#primaryimage"},"thumbnailUrl":"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg","datePublished":"2021-09-08T00:00:00+00:00","dateModified":"2026-05-12T13:31:06+00:00","breadcrumb":{"@id":"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/perspectives\/shuqaiq-3-inovasyonun-sinirlarini-zorlamak\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cms.alj3.clients.lemonhq.io\/tr\/perspectives\/shuqaiq-3-inovasyonun-sinirlarini-zorlamak\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/perspectives\/shuqaiq-3-inovasyonun-sinirlarini-zorlamak\/#primaryimage","url":"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg","contentUrl":"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg","width":2560,"height":1707},{"@type":"BreadcrumbList","@id":"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/perspectives\/shuqaiq-3-inovasyonun-sinirlarini-zorlamak\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/10.0.2.222\/en\/"},{"@type":"ListItem","position":2,"name":"Shuqaiq 3: inovasyonun s\u0131n\u0131rlar\u0131n\u0131 zorlamak"}]},{"@type":"WebSite","@id":"https:\/\/10.0.2.222\/en\/#website","url":"https:\/\/10.0.2.222\/en\/","name":"Abdul Latif Jameel","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/10.0.2.222\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"}]}},"post-meta-fields":{"_wp_page_template":["default"],"_published_date":["field_6057129b493f5"],"published_date":["20210908"],"_location":["field_601267396ce72"],"location":["Suudi Arabistan\u2019\u0131n Jizan"],"_featured":["field_601a3b473c5c5"],"featured":["0"],"_footnotes":["field_66fd39afb9383"],"footnotes":[""],"_business_sector":["field_66f6b5bcac8cb"],"business_sector":["Enerji"],"_content_series":["field_66fe3c439f8f6"],"content_series":[""],"_old_post_id":["field_66fe3fd59f8f7"],"old_post_id":["92218"],"_short_title":["field_60925d67125ef"],"short_title":["Shuqaiq 3: inovasyonun s\u0131n\u0131rlar\u0131n\u0131 zorlamak"],"_summary":["field_6019304103a20"],"summary":["<p>Projede yer alan ki\u015filerle yap\u0131lan bir dizi g\u00f6r\u00fc\u015fmenin par\u00e7as\u0131 olarak Shuqaiq 3\u2019\u00fcn Teknik \u0130\u015fler Direkt\u00f6r\u00fc Luis Morales, geli\u015ftirme s\u00fcrecinin karma\u015f\u0131kl\u0131\u011f\u0131n\u0131 ve ekibin benzeri g\u00f6r\u00fclmemi\u015f k\u00fcresel aksakl\u0131klara ra\u011fmen projeyi nas\u0131l ba\u015far\u0131l\u0131 bir \u015fekilde ray\u0131nda g\u00f6t\u00fcrd\u00fc\u011f\u00fcn\u00fc anlat\u0131yor.<\/p>"],"_mobile_featured_image":["field_66f6b4bee65f3"],"mobile_featured_image":["https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled-1.jpg"],"_push_notification":["field_66f6b47de65f1"],"push_notification":[""],"_publish_mobile":["field_66f6b491e65f2"],"publish_mobile":["0"],"_status":["field_652694983fe12"],"status":["publish"],"_thumbnail_id":["15008"],"_wpml_word_count":["{\"total\":1751,\"to_translate\":{\"ar\":1751,\"zh-hans\":1751,\"fr\":1751,\"ja\":1751,\"es\":1751,\"tr\":1751}}"],"_last_translation_edit_mode":["native-editor"],"amazonS3_cache":["a:10:{s:85:\"\/\/cms.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-Ariel-scaled-1.jpg\";a:2:{s:2:\"id\";s:4:\"8505\";s:11:\"source_type\";s:13:\"media-library\";}s:87:\"\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-Ariel-scaled-1.jpg\";a:2:{s:2:\"id\";s:4:\"8505\";s:11:\"source_type\";s:13:\"media-library\";}s:88:\"\/\/cms.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-Overview-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17518\";s:11:\"source_type\";s:13:\"media-library\";}s:90:\"\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-Overview-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17518\";s:11:\"source_type\";s:13:\"media-library\";}s:82:\"\/\/cms.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17519\";s:11:\"source_type\";s:13:\"media-library\";}s:84:\"\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17519\";s:11:\"source_type\";s:13:\"media-library\";}s:79:\"\/\/cms.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17520\";s:11:\"source_type\";s:13:\"media-library\";}s:81:\"\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17520\";s:11:\"source_type\";s:13:\"media-library\";}s:84:\"\/\/cms.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-Site-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17521\";s:11:\"source_type\";s:13:\"media-library\";}s:86:\"\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-Site-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17521\";s:11:\"source_type\";s:13:\"media-library\";}}"],"_edit_lock":["1778592572:22"],"content":["<p><em>G\u00fcneybat\u0131 Suudi Arabistan\u2019\u0131n Cizan ilindeki Shuqaiq 3 tuzdan ar\u0131nd\u0131rma tesisi, 2021\u2019in d\u00f6rd\u00fcnc\u00fc \u00e7eyre\u011finde tamamlanarak d\u00fcnyadaki en b\u00fcy\u00fck Ters Ozmoz (Reverse Osmosis - RO) tuzdan ar\u0131nd\u0131rma tesislerinden biri olacak.<\/em><\/p>\r\n<p><a href=\"https:\/\/www.almarwater.com\/\"><em>Almar Water Solutions<\/em><\/a> <em>(<\/em><a href=\"https:\/\/alj-enterprises.com\"><em>Abdul Latif Jameel Enterprises<\/em><\/a><em> arac\u0131l\u0131\u011f\u0131yla), <\/em><a href=\"https:\/\/www.acciona.com\/es\/\"><em>Acciona<\/em><\/a><em>, <\/em><a href=\"https:\/\/www.marubeni.com\/en\/\"><em>Marubeni Corporation<\/em><\/a><em> ve <\/em><a href=\"https:\/\/www.linkedin.com\/in\/rawafid-holding-423704140\/?originalSubdomain=sa\"><em>Rawafid Alhadarah Holding Co<\/em><\/a><em> konsorsiyumuna verilen 600 milyon ABD dolar\u0131 tutar\u0131ndaki bu altyap\u0131 yat\u0131r\u0131m\u0131n\u0131n g\u00fcnl\u00fck 450.000 metrek\u00fcp \u00fcretim kapasitesi, bir yandan 1,8 milyonu a\u015fk\u0131n yurtta\u015fa i\u00e7me suyu tedarikini garanti ederken \u00f6te yandan hem yerel hem de ulusal bazda ekonomik ve end\u00fcstriyel kalk\u0131nmaya da katk\u0131 sa\u011flayacak. <\/em><\/p>\r\n<p><em>Su end\u00fcstrisinde t\u00fcr\u00fcn\u00fcn en karma\u015f\u0131k ve yenilik\u00e7i tesislerden biri olarak bilinen bu tesis, Eyl\u00fcl 2019\u2019da BAE\u2019nin Dubai \u015fehrinde d\u00fczenlenen 2019 Orta Do\u011fu Enerji \u00d6d\u00fclleri\u2019nde \u201c<\/em><a href=\"https:\/\/www.alj.com\/en\/news\/shuqaiq-3-desalination-project-receives-the-utilities-project-of-the-year-award\/\"><em>Y\u0131l\u0131n Tesis Projesi<\/em><\/a><em>\u201d unvan\u0131n\u0131 kazanarak b\u00f6lgedeki en \u00f6nemli altyap\u0131 projelerinden biri olma stat\u00fcs\u00fcn\u00fc g\u00fc\u00e7lendirdi. COVID-19\u2019a ra\u011fmen bu proje, tedarik ve m\u00fchendislik s\u00fcre\u00e7lerinin zaman\u0131nda tamamlanmas\u0131 ve son derece etkileyici (ve halen devam etmekte olan) bir tesis emniyet kayd\u0131 ile planland\u0131\u011f\u0131 gibi ilerlemeyi ba\u015fard\u0131.<\/em><\/p>\r\n<p><em>Projede yer alan ki\u015filerle yap\u0131lan bir dizi g\u00f6r\u00fc\u015fmenin par\u00e7as\u0131 olarak Shuqaiq 3\u2019\u00fcn Teknik \u0130\u015fler Direkt\u00f6r\u00fc<\/em> <a href=\"https:\/\/www.linkedin.com\/in\/luis-morales-98710750\/\"><em>Luis Morales<\/em><\/a><em>, geli\u015ftirme s\u00fcrecinin karma\u015f\u0131kl\u0131\u011f\u0131n\u0131 ve ekibin benzeri g\u00f6r\u00fclmemi\u015f k\u00fcresel aksakl\u0131klara ra\u011fmen projeyi nas\u0131l ba\u015far\u0131l\u0131 bir \u015fekilde ray\u0131nda g\u00f6t\u00fcrd\u00fc\u011f\u00fcn\u00fc anlat\u0131yor.<\/em><\/p>\r\n<h2>\u015eimdiye kadarki ilerleme ne durumda ve \u00fcstesinden gelmeniz gereken en b\u00fcy\u00fck teknik zorluklar nelerdi?<\/h2>\r\n<p>Teknik a\u00e7\u0131dan en b\u00fcy\u00fck zorluk, elektrik t\u00fcketimini minimuma indirmek ve fabrikan\u0131n enerji verimlili\u011fini optimize etmekti. Bu, sadece in\u015faat ve operasyon s\u0131ras\u0131nda de\u011fil, ayn\u0131 zamanda projemizin ilk ba\u015fta ihaleyi kazanacak kadar iddial\u0131 ve yeterli olmas\u0131 bak\u0131m\u0131ndan da gerekliydi. En d\u00fc\u015f\u00fck enerji t\u00fcketimine sahip olan en iyi ekipman\u0131 bulmak i\u00e7in sat\u0131c\u0131larla ve tedarik\u00e7ilerle ve bu s\u00fcreci optimize edebilecek bir tasar\u0131m uygulama hedefi do\u011frultusunda m\u00fchendislerle yak\u0131n i\u015f birli\u011fi i\u00e7inde \u00e7al\u0131\u015ft\u0131k. \u0130haleyi kazanmak i\u00e7in yeterli rekabet g\u00fcc\u00fcne sahip bir konuma gelmemizin tek yolu buydu. \u015eimdi ise son derece optimize edilmi\u015f ve \u00e7evreye sayg\u0131l\u0131 bir tesisimiz var. Bu da bizim i\u00e7in son derece \u00f6nemli.<\/p>\r\n<h2>COVID-19 k\u00fcresel salg\u0131n\u0131, projenin ilerleyi\u015fini nas\u0131l etkiledi?<\/h2>\r\n<p>K\u00fcresel salg\u0131n\u0131n ilerlememiz \u00fczerinde b\u00fcy\u00fck bir etkisinin oldu\u011funu bilmek sizi \u015fa\u015f\u0131rtmayacakt\u0131r eminim. \u00c7ok say\u0131da potansiyel gecikme ile kar\u015f\u0131la\u015ft\u0131k. Bu gecikmeleri \u00f6nlemek i\u00e7in olduk\u00e7a proaktif bir yakla\u015f\u0131m sergiledik ve farkl\u0131 \u00e7\u00f6z\u00fcmler geli\u015ftirmek i\u00e7in y\u00fcklenicilerimizle birlikte \u00e7al\u0131\u015ft\u0131k. \u00d6rne\u011fin, su \u00e7ekme sisteminin kurulum s\u00fcrecini de\u011fi\u015ftirdik. Ba\u015flang\u0131\u00e7ta denizden k\u0131y\u0131ya kadar uzanan bir su \u00e7ekme sistemi in\u015fa etmeyi planlam\u0131\u015ft\u0131k. Ama bunu tam tersine \u00e7evirip karadan denize ta\u015f\u0131yarak in\u015fa ettik, bu da in\u015fa i\u015flerini sonu\u00e7land\u0131rmadan \u00f6nce bile su \u00e7ekmeye ba\u015flayabilece\u011fimiz anlam\u0131na geliyordu. Bunu yapmak i\u00e7in bir\u00e7ok s\u00fcreci de\u011fi\u015ftirmek zorunda kald\u0131k ve bu \u00e7ok zorlu bir s\u00fcre\u00e7 oldu: \u00d6rne\u011fin kaynak ekibinin borular \u00fczerinde \u00e7al\u0131\u015fabilmesi i\u00e7in yeni alanlar sa\u011flamam\u0131z gerekti.<\/p>\r\n\r\n[caption id=\"attachment_92167\" align=\"aligncenter\" width=\"2560\"]<img class=\"size-full wp-image-92167\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-Ariel.jpg\" alt=\"\" width=\"2560\" height=\"1919\" \/> Her biri 2 m \u00e7ap\u0131nda olan Shuqaiq 3 deniz suyu giri\u015f borular\u0131n\u0131n havadan g\u00f6r\u00fcn\u00fcm\u00fc. Foto\u011fraf Sahibi \u00a9 Abdul Latif Jameel Energy\/Almar Water Solutions[\/caption]\r\n\r\n<h2>Bu tesisin m\u00fcmk\u00fcn oldu\u011funca y\u00fcksek bir enerji verimlili\u011fine sahip olmas\u0131n\u0131n \u00f6nemini belirttiniz. Bunu nas\u0131l ba\u015fard\u0131n\u0131z?<\/h2>\r\n<p>Enerji verimlili\u011fi, teklifimiz a\u00e7\u0131s\u0131ndan \u00e7ok \u00f6nemliydi. Bunu ba\u015farmak i\u00e7in tedarik\u00e7iden daha verimli bir pompa veya daha iyi bir motor istemek yeterli de\u011fildi. Direkt olarak s\u00fcre\u00e7ler konusunda \u00e7ok daha yenilik\u00e7i \u00e7\u00f6z\u00fcmler ortaya koymam\u0131z gerekiyordu. Enerji t\u00fcketimini azaltmak i\u00e7in kendi tasar\u0131mlar\u0131m\u0131z\u0131 uyarlad\u0131k. \u00d6rne\u011fin, derin deniz suyunda daha verimli \u00e7al\u0131\u015fabilmeleri amac\u0131yla membranlar\u0131 sistemimize uyarlamak i\u00e7in membran tedarik\u00e7ileriyle yak\u0131ndan \u00e7al\u0131\u015ft\u0131k. Ayr\u0131 ayr\u0131 monte edilmi\u015f y\u00fcksek bas\u0131n\u00e7l\u0131 pompalar yerine bir \u201ciskelete\u201d monte edilmi\u015f y\u00fcksek bas\u0131n\u00e7l\u0131 pompalar kullanan bir sistem tasarlad\u0131k. Bu, t\u00fcm pompalar\u0131 ayn\u0131 anda y\u00f6netmemizi sa\u011flayacak ve verimlili\u011fi \u00f6nemli \u00f6l\u00e7\u00fcde art\u0131racakt\u0131. Suyun membranlardan iki kez ge\u00e7mesi i\u00e7in iki ge\u00e7i\u015fli bir proses kulland\u0131k. Verimlili\u011fi daha da art\u0131rmak amac\u0131yla birinci ve ikinci ge\u00e7i\u015f aras\u0131nda m\u00fckemmel da\u011f\u0131l\u0131m\u0131 bulmak i\u00e7in verileri dikkatle analiz ederek bu s\u00fcre\u00e7 \u00fczerinde ince ayar yapma imkan\u0131na sahip olduk.<\/p>\r\n<p>T\u00fcm bunlara ek olarak su pompas\u0131 bas\u0131nc\u0131n\u0131 4,5 bardan 3,9 bara d\u00fc\u015f\u00fcrmek i\u00e7in teknik uzmanlar\u0131m\u0131zla birlikte \u00e7al\u0131\u015ft\u0131k. Bu, \u00e7ok b\u00fcy\u00fck bir miktar gibi g\u00f6r\u00fcnmeyebilir ancak \u00fcretti\u011fimiz su miktar\u0131 (450.000 metrek\u00fcp) a\u00e7\u0131s\u0131ndan bak\u0131ld\u0131\u011f\u0131nda bas\u0131n\u00e7taki bu k\u00fc\u00e7\u00fck azalma, enerji verimlili\u011finde \u00e7ok b\u00fcy\u00fck kazan\u00e7lar sa\u011fl\u0131yor.<\/p>\r\n<h2>Almar Water Solutions, bu \u015fekilde inovasyon yapabilmesine imkan veren g\u00fc\u00e7l\u00fc bir uzmanl\u0131\u011fa ve deneyime sahip mi?<\/h2>\r\n<p>Evet, daha \u00f6nce d\u00fcnyan\u0131n d\u00f6rt bir yan\u0131ndaki projelerde \u00e7al\u0131\u015ft\u0131k ve elde etti\u011fimiz deneyim ve bilgiler, Shuqaiq 3\u2019\u00fc in\u015fa ederken bizim i\u00e7in son derece faydal\u0131 oldu. Ayr\u0131ca, y\u0131llar i\u00e7inde sat\u0131c\u0131lar ve tedarik\u00e7ilerle kurdu\u011fumuz g\u00fc\u00e7l\u00fc ili\u015fkiler en son yenilikleri ve teknikleri takip etmemize yard\u0131mc\u0131 oluyor.<\/p>\r\n\r\n[caption id=\"attachment_92174\" align=\"aligncenter\" width=\"2560\"]<img class=\"size-full wp-image-92174\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-Overview.jpg\" alt=\"\" width=\"2560\" height=\"1919\" \/> Shuqaiq 3 in\u015faat sahas\u0131n\u0131n havadan g\u00f6r\u00fcn\u00fcm\u00fc. Foto\u011fraf Sahibi \u00a9 Abdul Latif Jameel Energy\/Almar Water Solutions[\/caption]\r\n\r\n<h2>Shuqaiq 3, tuzdan ar\u0131nd\u0131r\u0131lm\u0131\u015f su \u00fcretmek i\u00e7in Ters Ozmoz teknolojisinden faydalan\u0131yor. Peki bunun d\u0131\u015f\u0131nda ba\u015fka teknolojiler kullanmay\u0131 d\u00fc\u015f\u00fcnm\u00fc\u015f m\u00fcyd\u00fcn\u00fcz?<\/h2>\r\n<p>Bu projenin ihale belgelerinde \u00f6zellikle ters ozmoz tekni\u011finin kullan\u0131lmas\u0131 gerekti\u011fi belirtilmi\u015fti, bu nedenle hangi teknolojinin kullan\u0131laca\u011f\u0131na dair s\u00f6z s\u00f6yleme imkan\u0131m\u0131z yoktu. Fakat se\u00e7im \u015fans\u0131m\u0131z olsa bile Ters Ozmoz tekni\u011fini se\u00e7erdik \u00e7\u00fcnk\u00fc deniz suyunu tuzdan ar\u0131nd\u0131rmak i\u00e7in \u015fu anda mevcut olan en verimli ve en iyi teknoloji bu.<\/p>\r\n<p>Ba\u015fka teknolojiler de var ancak bunlar daha eski ve daha d\u00fc\u015f\u00fck verime sahip. Ters Ozmoz ise her ge\u00e7en g\u00fcn daha verimli hale geliyor ve rekabet g\u00fcc\u00fcn\u00fc art\u0131r\u0131yor. Verimlili\u011fi daha da art\u0131rmak i\u00e7in yeni malzemelere, yeni \u00e7\u00f6z\u00fcmlere ve tekniklere \u00e7ok fazla yat\u0131r\u0131m yap\u0131l\u0131yor. Teknolojinin \u00f6n\u00fcm\u00fczdeki birka\u00e7 y\u0131l i\u00e7inde nas\u0131l geli\u015fece\u011fini g\u00f6rmek olduk\u00e7a heyecan verici olacak.<\/p>\r\n<p><img class=\"aligncenter size-full wp-image-92160\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Luis-Morales.jpg\" alt=\"\" width=\"2560\" height=\"1707\" \/><\/p>\r\n<h2>Bu b\u00f6lgede zaten iki su tesisi daha var: Shuqaiq 1 ve Shuqaiq 2. Yeni tesis bunlar\u0131n aras\u0131nda yer al\u0131yor. Bu durumdan kaynakl\u0131 ba\u015fka zorluklar var m\u0131yd\u0131?<\/h2>\r\n<p>Evet vard\u0131, \u00f6zellikle alanla ilgili bir sorunla kar\u015f\u0131la\u015ft\u0131k. K\u0131y\u0131da bolca alan\u0131m\u0131z olsa da a\u00e7\u0131k denizde alanlar daha k\u0131s\u0131tl\u0131. Di\u011fer iki tesisteki su \u00e7ekim sistemleri, bu tesisimizin her iki yan\u0131nda bulunuyor; bu nedenle denizde yap\u0131lan \u00e7al\u0131\u015fmalar s\u0131ras\u0131nda \u00e7ok dikkatli olmam\u0131z gerekiyordu. Bu, teknik a\u00e7\u0131dan in\u015faat\u0131n en zorlu taraf\u0131yd\u0131. Yaln\u0131zca boru tesisat\u0131n\u0131n 1,5 km olmas\u0131 nedeniyle de\u011fil, ayn\u0131 zamanda deniz \u00e7al\u0131\u015fmalar\u0131m\u0131z s\u0131ras\u0131nda Shuqaiq 1 ve 2\u2019nin su \u00e7ekim sistemlerini etkilemedi\u011fimizden emin olmam\u0131z gerekti\u011finden dolay\u0131 olduk\u00e7a s\u0131k\u0131nt\u0131 ya\u015fad\u0131k. Bunun i\u00e7in \u00f6rne\u011fin, sudaki bulan\u0131kl\u0131\u011f\u0131n artmas\u0131n\u0131 \u00f6nlemek amac\u0131yla s\u0131k\u0131 kontrol \u00f6nlemleri uygulamaya koyduk. Shuqaiq 2 suyun yan\u0131 s\u0131ra enerji de \u00fcretti\u011finden yak\u0131t, petrol vb. getirip g\u00f6t\u00fcr\u00fcl\u00fcrken \u00e7ok fazla gemi hareketi ya\u015fan\u0131yor, bu da baz\u0131 di\u011fer zorluklara yol a\u00e7\u0131yordu. Yan\u0131m\u0131zdaki her iki tesisle de iyi bir ili\u015fkimiz var, dolay\u0131s\u0131yla bu durum bir sorun yaratmad\u0131 ancak her zaman \u00e7ok dikkatli olmam\u0131z gerekiyordu.<\/p>\r\n<h2>Tesis, K\u0131z\u0131ldeniz k\u0131y\u0131lar\u0131nda bulunuyor. Bu alandaki su nas\u0131l?<\/h2>\r\n<p>K\u0131z\u0131ldeniz\u2019in suyu g\u00fczeldir, \u0131l\u0131kt\u0131r ve organizma a\u00e7\u0131s\u0131ndan \u00e7ok zengindir. Bu durum biyolojik \u00e7e\u015fitlilik a\u00e7\u0131s\u0131ndan harika olsa da tuzdan ar\u0131nd\u0131rma s\u00fcrecini zorla\u015ft\u0131r\u0131r. Yakla\u015f\u0131k 30 derecelik ortalama su s\u0131cakl\u0131\u011f\u0131yla \u00e7al\u0131\u015f\u0131yoruz ve biyolojik b\u00fcy\u00fcmenin y\u00fcksek seviyede olmas\u0131 bu s\u00fcre\u00e7 i\u00e7in tehlike te\u015fkil ediyor. Bu riski s\u00fcrekli olarak izlemek ve kontrol etmek zorunday\u0131z. \u00d6te yandan, K\u0131z\u0131ldeniz\u2019deki bulan\u0131kl\u0131k d\u00fczeyi iyi olu\u015fu bizim i\u00e7in bir avantaj. T\u00fcm bunlar\u0131 ba\u015f\u0131ndan beri biliyorduk ve yak\u0131nlardaki di\u011fer tesislerle olan g\u00fc\u00e7l\u00fc ili\u015fkilerimizden faydaland\u0131k; bu sorunlara kar\u015f\u0131 etkili \u00e7\u00f6z\u00fcmler uygulamak i\u00e7in onlar\u0131n deneyimlerinden ders ald\u0131k. \u00d6rne\u011fin, biyolojik b\u00fcy\u00fcmeyi (alglerin neden oldu\u011fu biyolojik kirlenme vb.) en aza indirmek i\u00e7in \u201cpigging sistemi\u201d ad\u0131 verilen bir sistem uyguluyoruz. Bu sistemde, borulardaki biyolojik b\u00fcy\u00fcmeyi temizlemek i\u00e7in bas\u0131n\u00e7l\u0131 su kullanarak i\u00e7eriden plastik bir \u201cmermi\u201d g\u00f6nderiyoruz, b\u00f6ylece su \u00e7ekim sistemindeki su hacmini sabit tutabiliyoruz. Ayr\u0131ca, suyun bu s\u0131cakl\u0131k seviyesindeki verimlili\u011fini koruyabilmemiz ve potansiyel olarak membranlara zarar verme riskini \u00f6nlememiz i\u00e7in membran tedarik\u00e7isiyle birlikte \u00e7al\u0131\u015f\u0131yoruz.<\/p>\r\n<h2>Membranlar tuzdan ar\u0131nd\u0131rma s\u00fcrecinin \u00f6nemli bir par\u00e7as\u0131. Ka\u00e7 adet membran kullan\u0131yorsunuz?<\/h2>\r\n<p>Proses, birincisinde 41.000 ve ikincisinde 13.000 olmak \u00fczere iki ge\u00e7i\u015fte yakla\u015f\u0131k 54.000 adet membran kullan\u0131r. Her membran\u0131n uzunlu\u011fu yakla\u015f\u0131k 1 metredir, yani burada toplam 54 km\u2019lik bir membran sisteminden bahsediyoruz.<\/p>\r\n\r\n[caption id=\"attachment_92188\" align=\"aligncenter\" width=\"2560\"]<img class=\"size-full wp-image-92188\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3.jpg\" alt=\"\" width=\"2560\" height=\"1707\" \/> Shuqaiq 3 tesisindeki Ters Ozmoz bas\u0131n\u00e7 kaplar\u0131. Foto\u011fraf Sahibi: \u00a9 Abdul Latif Jameel Energy\/Almar Water Solutions.[\/caption]\r\n\r\n<h2>Shuqaiq 3\u2019\u00fcn verimlili\u011fi \u00f6nceki nesil tuzdan ar\u0131nd\u0131rma tesislerine k\u0131yasla nas\u0131l?<\/h2>\r\n<p>Bu t\u00fcr tesisler 2000\u2019li y\u0131llarda genellikle 50.000 metrek\u00fcp ila 100.000 metrek\u00fcp aras\u0131nda kapasiteyle \u00fcretildi. 2010\u2019lara gelindi\u011finde bu rakam yakla\u015f\u0131k 200.000\u2019e y\u00fckseldi ve d\u00fcnyadaki en b\u00fcy\u00fck tesis, 400.000 metre k\u00fcp kapasiteye ula\u015ft\u0131. Shuqaiq 3\u2019\u00fcn kapasitesi 450.000 metrek\u00fcp, yani \u015fimdiye kadar \u00f6l\u00e7\u00fclen en b\u00fcy\u00fck de\u011ferden bile daha b\u00fcy\u00fck ve muhtemelen d\u00fcnyan\u0131n en iyi 10 tesisi i\u00e7erisinde.<\/p>\r\n<p>Suudi Arabistan\u2019da ba\u015fka b\u00fcy\u00fck tesisler de in\u015fa ediliyor; ancak bu tesisler tamamland\u0131\u011f\u0131nda bile Shuqaiq 3, \u00fcretim kapasitesi a\u00e7\u0131s\u0131ndan en b\u00fcy\u00fck 5 tesis aras\u0131nda yer almaya devam edecek.<\/p>\r\n<h2>Almar Water Solutions, Shuqaiq 3\u2019\u00fc geli\u015ftiren ortaklar konsorsiyumunun bir par\u00e7as\u0131. Bu t\u00fcr bir projede ortakl\u0131k yakla\u015f\u0131m\u0131 ne kadar \u00f6nemli?<\/h2>\r\n<p>Bence burada ortakl\u0131k yakla\u015f\u0131m\u0131 \u015fart. Konsorsiyumumuzda Almar, bu t\u00fcr geli\u015ftirme projeleri konusunda teknik bilgi, uzmanl\u0131k ve deneyime sahip. Ancak bunun gibi bir proje, in\u015faat i\u015finden \u00e7ok daha fazlas\u0131n\u0131 i\u00e7eriyor.<\/p>\r\n<p>Finansal uzmanl\u0131k, proje y\u00f6netimi, yat\u0131r\u0131m, operasyonlar vb. uzmanl\u0131klar gerekiyor. Ba\u015fka ortaklarla birlikte \u00e7al\u0131\u015fmak, konsorsiyumun t\u00fcm bu tamamlay\u0131c\u0131 uzmanl\u0131k alanlar\u0131ndan faydalanmas\u0131 anlam\u0131na geliyor. Nitekim bu ortakl\u0131k ba\u015far\u0131l\u0131 da oldu. Konsorsiyum i\u00e7inde g\u00fc\u00e7l\u00fc ili\u015fkiler kurduk ve bu da projeye b\u00fcy\u00fck fayda sa\u011flad\u0131.<\/p>\r\n<p><img class=\"aligncenter size-full wp-image-92181\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-Site.jpg\" alt=\"\" width=\"2560\" height=\"1707\" \/><\/p>\r\n<h2>\u00c7evre sorunlar\u0131 son y\u0131llarda \u00e7ok daha \u00f6nemli hale geldi. Shuqaiq 3\u2019\u00fcn \u00e7evresel etkisini en aza indirmek i\u00e7in hangi \u00f6nlemler al\u0131n\u0131yor?<\/h2>\r\n<p>Almar Water Solutions i\u00e7in tesisin s\u00fcrd\u00fcr\u00fclebilirli\u011fini optimize etmek, kendi de\u011ferleri ve i\u015f yapma \u015fekli ile tam olarak uyumlu olan bir husustur. Yaln\u0131zca in\u015faat s\u0131ras\u0131nda de\u011fil, ayn\u0131 zamanda operasyon s\u0131ras\u0131ndaki her a\u015famada \u00e7evreye sayg\u0131 duymay\u0131 ama\u00e7l\u0131yoruz. Bunu ba\u015farmam\u0131za yard\u0131mc\u0131 olmas\u0131 i\u00e7in bir dizi \u00f6nlem ve teknoloji uygulad\u0131k. \u00d6rne\u011fin bu tesiste, tuzdan ar\u0131nd\u0131rma s\u0131ras\u0131nda deniz suyundan \u00e7\u0131kard\u0131\u011f\u0131m\u0131z t\u00fcm malzemeleri ar\u0131tmak i\u00e7in \u00f6zel bir \u00e7amur ar\u0131tma tesisi bulunuyor. Tuzdan ar\u0131nd\u0131rma tesislerinin hepsi b\u00f6yle bir \u00f6zel tesise sahip de\u011fil. Bu sayede \u00fcretti\u011fimiz t\u00fcm at\u0131klar\u0131n tehlikesiz olmas\u0131n\u0131 ve \u00e7evreye zarar vermemesini sa\u011flayabiliyoruz.<\/p>\r\n<p>Borular\u0131n i\u00e7ini temizlemek i\u00e7in kulland\u0131\u011f\u0131m\u0131z pigging sistemi de \u00e7evre dostu \u00f6zellikte. Mekanik bir temizleme sistemi olmas\u0131, su \u00e7ekim borular\u0131n\u0131 ve su \u00e7ekim kulesini temizlemek i\u00e7in kimyasal kullanmaktan ka\u00e7\u0131narak kulland\u0131\u011f\u0131m\u0131z hipoklorit miktar\u0131n\u0131 s\u0131n\u0131rlayabilmemiz anlam\u0131na geliyor.<\/p>\r\n<p>Son olarak in\u015faat a\u015famas\u0131nda, deniz ya\u015fam alan\u0131na \u00f6zen g\u00f6steren stratejiler kullan\u0131yoruz. \u00d6rne\u011fin, borular\u0131 deniz zeminine g\u00f6md\u00fc\u011f\u00fcm\u00fczde \u00e7\u0131kard\u0131\u011f\u0131m\u0131z y\u00fcksek miktardaki \u00e7amuru ba\u015fka bir yere bo\u015faltarak deniz ya\u015fam alan\u0131n\u0131 bozmak yerine, bu malzemeyi denizden \u00e7\u0131karmak i\u00e7in emici tarak gemileri kulland\u0131k. Bu \u00e7amuru sakl\u0131yor, kurutuyor ve daha sonra boru kanallar\u0131n\u0131n doldurulmas\u0131 i\u00e7in kullan\u0131yoruz. B\u00f6ylece bu malzemeyi ald\u0131\u011f\u0131m\u0131z yere geri koymu\u015f oluyoruz. Benzer \u015fekilde, tuzdan ar\u0131nd\u0131rma sonras\u0131 elde edilen yo\u011fun tuzlu suyu 200 metrelik bir boru hatt\u0131 boyunca \u00e7e\u015fitli noktalarda tekrar denize da\u011f\u0131t\u0131yoruz, b\u00f6ylece bu su okyanusta \u00e7ok h\u0131zl\u0131 bir \u015fekilde da\u011f\u0131l\u0131yor ve belirli bir alanda a\u015f\u0131r\u0131 tuz yo\u011funlu\u011funa neden olmuyor.<\/p>\r\n<p><iframe src=\"\/\/www.youtube.com\/embed\/KITq7UXrWQE\" width=\"560\" height=\"314\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\r\n<h2>Daha \u00f6nce de ba\u015fka Almar projelerinde \u00e7al\u0131\u015fm\u0131\u015ft\u0131n\u0131z. Di\u011fer projelerle kar\u015f\u0131la\u015ft\u0131r\u0131ld\u0131\u011f\u0131nda bu proje hakk\u0131nda neler s\u00f6yleyebilirsiniz?<\/h2>\r\n<p>Daha \u00f6nce, ba\u015fka konumlardaki Almar projelerinde \u00e7al\u0131\u015ft\u0131m ve ayr\u0131ca \u00e7al\u0131\u015fma hayat\u0131m boyunca d\u00fcnyan\u0131n d\u00f6rt bir yan\u0131ndaki ba\u015fka projelerde de g\u00f6rev ald\u0131m. Her bir proje, yerel ko\u015fullara ba\u011fl\u0131 olarak birbirinden \u00e7ok farkl\u0131yd\u0131. Shuqaiq 3 bunlar aras\u0131nda muhtemelen en unutulmaz olan\u0131; \u00e7\u00fcnk\u00fc \u00fczerine, \u00f6zellikle Mart 2020\u2019den Eyl\u00fcl 2020\u2019ye kadar olan d\u00f6nemde COVID-19 ko\u015fullar\u0131n\u0131n getirdi\u011fi karma\u015fa eklendi. Soka\u011fa \u00e7\u0131kma yasa\u011f\u0131 vard\u0131, tedarikte gecikmeler oldu ve insanlar seyahat edemedi. O d\u00f6nemlerde bu i\u015fi tamamlamak \u00e7ok zordu, buna ra\u011fmen i\u015fi ba\u015far\u0131l\u0131 bir \u015fekilde teslim etti\u011fimiz ve projenin kilit tarihlere ula\u015fmas\u0131n\u0131 sa\u011flad\u0131\u011f\u0131m\u0131z i\u00e7in \u00e7ok gurur duyuyorum. \u015eimdi, \u00f6n\u00fcm\u00fczdeki en \u00f6nemli kilit tarih, 2021 Ekim ay\u0131n\u0131n sonundaki \u00fcretime ge\u00e7i\u015f tarihi. Ancak bunu ba\u015faraca\u011f\u0131m\u0131z konusunda da \u015f\u00fcphem yok.<\/p>"],"_content":[""],"_ame_cpe_post_policy":["{\"accessProtection\":{\"active\":\"replace\"}}"],"_edit_last":["22"],"_wpml_media_duplicate":["1"],"_wpml_media_featured":["1"],"_yoast_wpseo_content_score":["90"],"_yoast_wpseo_estimated-reading-time-minutes":["1"]},"_links":{"self":[{"href":"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/wp-json\/wp\/v2\/perspectives\/15017","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/wp-json\/wp\/v2\/perspectives"}],"about":[{"href":"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/wp-json\/wp\/v2\/types\/perspectives"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/wp-json\/wp\/v2\/media\/15008"}],"wp:attachment":[{"href":"https:\/\/cms.alj3.clients.lemonhq.io\/tr\/wp-json\/wp\/v2\/media?parent=15017"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}