{"id":15013,"date":"2021-09-08T00:00:00","date_gmt":"2021-09-08T00:00:00","guid":{"rendered":"https:\/\/cms.alj3.clients.lemonhq.io\/perspectives\/shuqaiq-3-repousser-les-limites-de-linnovation\/"},"modified":"2026-05-12T11:35:50","modified_gmt":"2026-05-12T11:35:50","slug":"shuqaiq-3-repousser-les-limites-de-linnovation","status":"publish","type":"perspectives","link":"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/perspectives\/shuqaiq-3-repousser-les-limites-de-linnovation\/","title":{"rendered":"Shuqaiq 3 : repousser les limites de l\u2019innovation"},"content":{"rendered":"<p><em>The Shuqaiq 3 desalination plant in Jizan province in south-west Saudi Arabia will be one of the largest Reverse Osmosis (RO) desalination plants in the world when complete in the fourth quarter of 2021.<\/em><\/p>\n<p><em>Awarded to <\/em><em>a consortium of <\/em><a href=\"https:\/\/www.almarwater.com\/\"><em>Almar Water Solutions<\/em><\/a> <em>(through <\/em><a href=\"https:\/\/alj-enterprises.com\"><em>Abdul Latif Jameel Enterprises<\/em><\/a><em>), <\/em><a href=\"https:\/\/www.acciona.com\/es\/\"><em>Acciona<\/em><\/a><em>, <\/em><a href=\"https:\/\/www.marubeni.com\/en\/\"><em>Marubeni Corporation<\/em><\/a><em> and <\/em><a href=\"https:\/\/www.linkedin.com\/in\/rawafid-holding-423704140\/?originalSubdomain=sa\"><em>Rawafid Alhadarah Holding Co<\/em><\/a><em>, its <\/em><em>450,000 cubic meter daily production capacity from this US$ 600m infrastructure investment will guarantee the supply of drinking water to over 1.8 million citizens, while also contributing to economic and industrial development both locally and nationally. <\/em><\/p>\n<p><em>Recognized throughout the water industry as one of the most complex and innovative plants of its kind, in September 2019 it was named the \u2018<\/em><a href=\"https:\/\/www.alj.com\/en\/news\/shuqaiq-3-desalination-project-receives-the-utilities-project-of-the-year-award\/\"><em>Utilities Project of the Year<\/em><\/a><em>\u2019 at the Middle East Energy Awards 2019, held in Dubai, UAE, cementing its status as one of the flagship new infrastructure projects in the region. \u00a0Despite COVID-19, the project has managed to stay on track, with procurement and engineering kept on time and a very impressive \u2013 and ongoing \u2013 site safety record.<\/em><\/p>\n<p><em>As part of a series of interviews with people involved in the project,<\/em> <a href=\"https:\/\/www.linkedin.com\/in\/luis-morales-98710750\/\"><em>Luis Morales<\/em><\/a><em>, Technical Director at Shuqaiq 3, <\/em><em>discusses the complexities of the development and how the team has successfully kept the project on track despite unprecedented global disruption.<\/em><\/p>\n<h2>How has progress been so far and what have been the biggest technical challenges you\u2019ve had to address?<\/h2>\n<p>Technically speaking, the biggest challenge was minimizing the electrical consumption and optimizing the energy efficiency of the plant, not only for the construction and operation, but for the tender to be competitive enough to be awarded the project in the first place. \u00a0We\u2019ve worked closely with vendors and suppliers to find the best equipment with the lowest energy consumption, as well as with the engineers to implement a design which could optimize the process. \u00a0It was the only way we could build a strong enough competitive position to win the tender. \u00a0Now we have a plant which is highly optimized and respects the environment, which is extremely important to us.<\/p>\n<h2>How was the progress of the project effect by the COVID-19 pandemic?<\/h2>\n<p>It won\u2019t surprise you to know that the pandemic had a big impact on our progress. \u00a0We faced a lot of potential delays. \u00a0To avoid these delays, we were very proactive, and we worked with our contractors to develop different solutions. \u00a0For example, we changed the process for installing the intake. \u00a0We had originally planned to construct the intake from the sea to the shore. \u00a0But we switched it around and built it from the shore to the sea instead, which meant we could start taking in water even before finalizing the works. \u00a0To do that, we had to change a lot of processes, such as providing new launch areas where the welding team could work on the pipes, and that was very challenging.<\/p>\n<div id=\"attachment_92161\" style=\"width: 2570px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-92161\" class=\"size-full wp-image-92161\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-Ariel-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1919\" \/><p id=\"caption-attachment-92161\" class=\"wp-caption-text\">Aerial view of the Shuqaiq 3 seawater inlet pipes, each 2m in diameter.\u00a0 Photo Credit \u00a9 Abdul Latif Jameel Energy\/Almar Water Solutions<\/p><\/div>\n<h2>You mentioned the importance of making this plant as energy efficient as possible. How did you achieve this?<\/h2>\n<p>Energy efficiency was essential to our bid. \u00a0To achieve it, it\u2019s not enough to simply ask a supplier for a more efficient pump or a better motor. \u00a0We had to be a lot more innovative in terms of the processes themselves. \u00a0We adapted our designs to reduce energy consumption. \u00a0We worked with membrane suppliers to adapt the membranes so they would function more efficiently in deep seawater, for example. \u00a0We designed a system that uses high pressure pumps installed in a \u2018frame\u2019, rather than individually. \u00a0This allows us to manage all the pumps at the same time, which significantly improves efficiency. \u00a0We use a two-pass process for the water, whereby it passes through the membranes twice. \u00a0By carefully analyzing the data, we can tweak this process to find the perfect distribution between the first and the second pass to improve efficiency even more.<\/p>\n<p>In addition, we worked with our technical specialists to reduce the water pump pressure from 4.5 bars to 3.9. This may not seem like a lot, but in terms of the amount of water we produce &#8211; 450,000 cubic meters &#8211; this small reduction in pressure results in very big gains in energy efficiency.<\/p>\n<h2>Does Almar Water Solutions have strong expertise and experience to enable it to innovate in this way?<\/h2>\n<p>Yes, we\u2019ve previously worked on projects all over the world and we\u2019ve been able to use the experience and knowledge we\u2019ve gained to benefit Shuqaiq 3.\u00a0 Also, the strong relationships we have built up over the years with vendors and suppliers helps us keep on top of the latest innovations and techniques.<\/p>\n<div id=\"attachment_92168\" style=\"width: 2570px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-92168\" class=\"size-full wp-image-92168\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-Overview-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1919\" \/><p id=\"caption-attachment-92168\" class=\"wp-caption-text\">Aerial view of the Shuqaiq 3 construction site. Photo Credit \u00a9 Abdul Latif Jameel Energy\/Almar Water Solutions<\/p><\/div>\n<h2>Shuqaiq 3 uses Reverse Osmosis technology to produce desalinated water. Were other technologies considered?<\/h2>\n<p>In this case, the tender documents specified reverse osmosis, so we did not have any say in which technology was used. \u00a0But even if we did, we would have chosen Reverse Osmosis because it\u2019s the most efficient and the best technology currently available for desalinating seawater.<\/p>\n<p>There are other technologies, but they tend be older and less efficient, whereas Reverse Osmosis is getting more efficient and more competitive all the time.\u00a0 There is a lot of investment into new materials, new solutions and techniques for improving the efficiency even further.\u00a0 It\u2019s quite exciting to see how the technology develops over the next few years.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-92154\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Luis-Morales-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1707\" \/><\/p>\n<h2>There are already two other water plants in that location, Shuqaiq 1 and Shuqaiq 2. The new plant sits between them. Did this present any additional challenges?<\/h2>\n<p>Yes, it did, principally one of space. \u00a0On shore, we have plenty of space, but offshore, the amount of space is more restricted. \u00a0The intakes from the other two plants lie on both sides of our plant, so we had to be very careful during the marine works.\u00a0 That was probably the most technically challenging aspect of the construction, not only because it is 1.5km of pipe installation, but also because we have to be sure that we are not impacting the intakes of Shuqaiq 1 and 2 during our marine works.\u00a0 We put in place strict control measures to avoid increasing turbidity in the water, for example. \u00a0Shuqaiq 2 also produces power as well as water, so there are quite a lot of ship movements in and out, bringing in fuel, oil and so forth, which also created additional challenges.\u00a0 We have a good relationship with both our neighbors, so it wasn\u2019t a problem, but we had to be very careful at all times.<\/p>\n<h2>The plant is on the shores of the Red Sea. What is the water like in that area?<\/h2>\n<p>The water in the Red Sea is beautiful, but it is warm and very rich in organisms. \u00a0It is fantastic in terms of biodiversity but makes the desalination process more difficult. \u00a0We are working with an average water temperature of around 30 degrees and the high level of biological growth is dangerous for the process. \u00a0We have to constantly monitor and control this risk.\u00a0 On the other hand, the turbidity is good, which is an advantage. \u00a0However, we knew this from the outset and, thanks to our strong relationships with the other plants nearby, we have been able to learn from their experiences to implement effective solutions to these problems. \u00a0For example, to minimize biological growth (biofouling with algae, etc.) we are implementing a so-called \u2018pigging system\u2019. \u00a0This is where we use pressurized water to fire a plastic \u2018bullet\u2019 along the pipes to clean the biological growth off the inside, so we can maintain a consistent volume of water in the intake. \u00a0We have also been working with the membrane supplier to ensure we can maintain productivity at this water temperature and avoid any potential risk of damaging the membranes.<\/p>\n<h2>Membranes are a crucial part of the desalination process. How many membranes do you use?<\/h2>\n<p>Our process uses around 54,000 membranes in two passes: 41,000 in the first and 13,000 in the second. \u00a0Each membrane is around 1m in length, so we are talking about 54km of membranes in total.<\/p>\n<div id=\"attachment_92182\" style=\"width: 2570px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-92182\" class=\"size-full wp-image-92182\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1707\" \/><p id=\"caption-attachment-92182\" class=\"wp-caption-text\">The Reverse Osmosis pressure vessels at Shuqaiq 3.\u00a0 Photo Credit: \u00a9 Abdul Latif Jameel Energy\/Almar Water solutions.<\/p><\/div>\n<h2>How does the productivity of Shuqaiq 3 compare to previous generations of desalination plants?<\/h2>\n<p>In the 2000s, plants usually produced between 50,000 cubic meters and 100,000 cubic meters. \u00a0By the 2010s, this had increased to around 200,000, with the biggest one in the world achieving 400,000 cubic meters.\u00a0 Shuqaiq 3 is 450,000 cubic meters \u2013 so even bigger than the then biggest to date and still probably in the world top 10 of commissioned plants.<\/p>\n<p>They are building some other huge plants in Saudi Arabia, but even when they are completed, Shuqaiq 3 will still be in the top 5 biggest plants in terms of production capacity.<\/p>\n<h2>Almar Water Solutions is part of a consortium of partners developing Shuqaiq 3. How important is a partnership approach in a project like this?<\/h2>\n<p>I think it is essential. \u00a0In our consortium, Almar has the technical knowledge, expertise and previous experience of this kind of development. \u00a0But a project like this is about much more than construction.<\/p>\n<p>It needs finance expertise, project management, investment, operations, and so on. \u00a0Working with other partners means the consortium benefits from bringing in all these other complementary areas of expertise. \u00a0And our partnership has worked well. \u00a0We have built strong relationships within the consortium, and this has benefitted the project enormously.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-92175\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-Site-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1707\" \/><\/p>\n<h2>Environmental issues have become much more important in recent years. What measures are being taken to minimize the environmental impact of Shuqaiq 3?<\/h2>\n<p>Optimizing the sustainability of the plant is something that fully aligns with own values and way of doing business at Almar Water Solutions.\u00a0 We want to respect the environment at every stage, not only during construction, but also during operation. \u00a0We have implemented a number of measures and technologies to help us achieve this. \u00a0For example, this plant has a sludge treatment facility to treat all the material we remove from the seawater during desalination. \u00a0Not all desalination plants have a facility like this. \u00a0It means that all the waste we produce is innocuous and not harmful to the environment.<\/p>\n<p>The pigging system we use to clean the inside of the pipes is also environmentally friendly. \u00a0It is a mechanical cleaning system, which means we can avoid using chemicals to clean out the intake pipes and intake tower, so we can limit the amount of hypochlorite we use.<\/p>\n<p>Finally, during the construction phase, we are using strategies that are more respectful to the marine environment. \u00a0For example, when we buried the pipes in the sea floor, we removed a lot of mud. \u00a0But instead of just dumping this mud somewhere else and disrupting the marine environment, we used sucker dredgers to take this material out of the sea.\u00a0 We store it. \u00a0We dry it, and then we use it to backfill the pipe trenches \u2013 so essentially, we are putting it back in the location it came from. \u00a0Similarly, with the brine from the desalinated water, we disperse it back into the sea at various points along a 200 meter pipe, so it disperses very quickly in the ocean and does not overload one particular area.<\/p>\n<p><iframe loading=\"lazy\" src=\"\/\/www.youtube.com\/embed\/KITq7UXrWQE\" width=\"560\" height=\"314\" allowfullscreen=\"allowfullscreen\" data-mce-fragment=\"1\"><\/iframe><\/p>\n<h2>You have worked on previous Almar projects. How does this one compare to others you have worked on?<\/h2>\n<p>I\u2019ve worked on previous Almar projects in other locations, and also for other projects around the world in my previous lives. \u00a0Each one is very different, depending on the local circumstances.\u00a0 Shuqaiq 3 is probably the most memorable because it\u00a0 had the added complication of the COVID-19 situation, particularly from March to September 2020.\u00a0 There were curfews, delays in supplies, people couldn\u2019t travel.\u00a0 It was a very difficult at time, but I\u2019m very proud that we made it through successfully and kept the project moving forward to meet its key dates.\u00a0 The main key date now is the commissioning date at the end of October 2021, but I\u2019m confident we will achieve it.<\/p>\n","protected":false},"featured_media":15008,"menu_order":0,"template":"","class_list":["post-15013","perspectives","type-perspectives","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Shuqaiq 3 : repousser les limites de l\u2019innovation - Abdul Latif Jameel<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Shuqaiq 3 : repousser les limites de l\u2019innovation - Abdul Latif Jameel\" \/>\n<meta property=\"og:description\" content=\"The Shuqaiq 3 desalination plant in Jizan province in south-west Saudi Arabia will be one of the largest Reverse Osmosis (RO) desalination plants in the world when complete in the fourth quarter of 2021. Awarded to a consortium of Almar Water Solutions (through Abdul Latif Jameel Enterprises), Acciona, Marubeni Corporation and Rawafid Alhadarah Holding Co, [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/perspectives\/shuqaiq-3-repousser-les-limites-de-linnovation\/\" \/>\n<meta property=\"og:site_name\" content=\"Abdul Latif Jameel\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-12T11:35:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/perspectives\/shuqaiq-3-repousser-les-limites-de-linnovation\/\",\"url\":\"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/perspectives\/shuqaiq-3-repousser-les-limites-de-linnovation\/\",\"name\":\"Shuqaiq 3 : repousser les limites de l\u2019innovation - Abdul Latif Jameel\",\"isPartOf\":{\"@id\":\"https:\/\/10.0.2.222\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/perspectives\/shuqaiq-3-repousser-les-limites-de-linnovation\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/perspectives\/shuqaiq-3-repousser-les-limites-de-linnovation\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg\",\"datePublished\":\"2021-09-08T00:00:00+00:00\",\"dateModified\":\"2026-05-12T11:35:50+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/perspectives\/shuqaiq-3-repousser-les-limites-de-linnovation\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/perspectives\/shuqaiq-3-repousser-les-limites-de-linnovation\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/perspectives\/shuqaiq-3-repousser-les-limites-de-linnovation\/#primaryimage\",\"url\":\"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg\",\"contentUrl\":\"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg\",\"width\":2560,\"height\":1707},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/perspectives\/shuqaiq-3-repousser-les-limites-de-linnovation\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/10.0.2.222\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Shuqaiq 3 : repousser les limites de l\u2019innovation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/10.0.2.222\/en\/#website\",\"url\":\"https:\/\/10.0.2.222\/en\/\",\"name\":\"Abdul Latif Jameel\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/10.0.2.222\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Shuqaiq 3 : repousser les limites de l\u2019innovation - Abdul Latif Jameel","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"fr_FR","og_type":"article","og_title":"Shuqaiq 3 : repousser les limites de l\u2019innovation - Abdul Latif Jameel","og_description":"The Shuqaiq 3 desalination plant in Jizan province in south-west Saudi Arabia will be one of the largest Reverse Osmosis (RO) desalination plants in the world when complete in the fourth quarter of 2021. Awarded to a consortium of Almar Water Solutions (through Abdul Latif Jameel Enterprises), Acciona, Marubeni Corporation and Rawafid Alhadarah Holding Co, [&hellip;]","og_url":"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/perspectives\/shuqaiq-3-repousser-les-limites-de-linnovation\/","og_site_name":"Abdul Latif Jameel","article_modified_time":"2026-05-12T11:35:50+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Dur\u00e9e de lecture estim\u00e9e":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/perspectives\/shuqaiq-3-repousser-les-limites-de-linnovation\/","url":"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/perspectives\/shuqaiq-3-repousser-les-limites-de-linnovation\/","name":"Shuqaiq 3 : repousser les limites de l\u2019innovation - Abdul Latif Jameel","isPartOf":{"@id":"https:\/\/10.0.2.222\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/perspectives\/shuqaiq-3-repousser-les-limites-de-linnovation\/#primaryimage"},"image":{"@id":"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/perspectives\/shuqaiq-3-repousser-les-limites-de-linnovation\/#primaryimage"},"thumbnailUrl":"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg","datePublished":"2021-09-08T00:00:00+00:00","dateModified":"2026-05-12T11:35:50+00:00","breadcrumb":{"@id":"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/perspectives\/shuqaiq-3-repousser-les-limites-de-linnovation\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cms.alj3.clients.lemonhq.io\/fr\/perspectives\/shuqaiq-3-repousser-les-limites-de-linnovation\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/perspectives\/shuqaiq-3-repousser-les-limites-de-linnovation\/#primaryimage","url":"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg","contentUrl":"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg","width":2560,"height":1707},{"@type":"BreadcrumbList","@id":"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/perspectives\/shuqaiq-3-repousser-les-limites-de-linnovation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/10.0.2.222\/en\/"},{"@type":"ListItem","position":2,"name":"Shuqaiq 3 : repousser les limites de l\u2019innovation"}]},{"@type":"WebSite","@id":"https:\/\/10.0.2.222\/en\/#website","url":"https:\/\/10.0.2.222\/en\/","name":"Abdul Latif Jameel","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/10.0.2.222\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"}]}},"post-meta-fields":{"_wp_page_template":["default"],"_published_date":["field_6057129b493f5"],"published_date":["20210908"],"_location":["field_601267396ce72"],"location":["Jizan, Arabie Saoudite"],"_featured":["field_601a3b473c5c5"],"featured":["0"],"_footnotes":["field_66fd39afb9383"],"footnotes":[""],"_business_sector":["field_66f6b5bcac8cb"],"business_sector":["\u00c9nergie"],"_content_series":["field_66fe3c439f8f6"],"content_series":[""],"_old_post_id":["field_66fe3fd59f8f7"],"old_post_id":["92216"],"_short_title":["field_60925d67125ef"],"short_title":["Shuqaiq 3 : repousser les limites de l\u2019innovation"],"_summary":["field_6019304103a20"],"summary":["<p>Dans le cadre d\u2019une s\u00e9rie d\u2019entretiens avec des personnes impliqu\u00e9es dans le projet, Luis Morales, directeur technique de Shuqaiq 3, explique les complexit\u00e9s du d\u00e9veloppement et la mani\u00e8re dont l\u2019\u00e9quipe a r\u00e9ussi \u00e0 mener \u00e0 bien le projet malgr\u00e9 des bouleversement mondiaux sans pr\u00e9c\u00e9dent.<\/p>"],"_mobile_featured_image":["field_66f6b4bee65f3"],"mobile_featured_image":["https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled-1.jpg"],"_push_notification":["field_66f6b47de65f1"],"push_notification":[""],"_publish_mobile":["field_66f6b491e65f2"],"publish_mobile":["0"],"_status":["field_652694983fe12"],"status":["publish"],"_thumbnail_id":["15008"],"_wpml_word_count":["{\"total\":2269,\"to_translate\":{\"ar\":2269,\"zh-hans\":2269,\"fr\":2269,\"ja\":2269,\"es\":2269,\"tr\":2269}}"],"_last_translation_edit_mode":["native-editor"],"amazonS3_cache":["a:10:{s:85:\"\/\/cms.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-Ariel-scaled-1.jpg\";a:2:{s:2:\"id\";s:4:\"8505\";s:11:\"source_type\";s:13:\"media-library\";}s:87:\"\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-Ariel-scaled-1.jpg\";a:2:{s:2:\"id\";s:4:\"8505\";s:11:\"source_type\";s:13:\"media-library\";}s:88:\"\/\/cms.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-Overview-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17518\";s:11:\"source_type\";s:13:\"media-library\";}s:90:\"\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-Overview-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17518\";s:11:\"source_type\";s:13:\"media-library\";}s:82:\"\/\/cms.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17519\";s:11:\"source_type\";s:13:\"media-library\";}s:84:\"\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17519\";s:11:\"source_type\";s:13:\"media-library\";}s:79:\"\/\/cms.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17520\";s:11:\"source_type\";s:13:\"media-library\";}s:81:\"\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17520\";s:11:\"source_type\";s:13:\"media-library\";}s:84:\"\/\/cms.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-Site-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17521\";s:11:\"source_type\";s:13:\"media-library\";}s:86:\"\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-Site-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17521\";s:11:\"source_type\";s:13:\"media-library\";}}"],"_edit_lock":["1778585783:22"],"content":["<p><em>L\u2019usine de dessalage Shuqaiq 3, dans la province de Jizan, dans le sud-ouest de l\u2019Arabie saoudite, sera l\u2019une des plus grandes usines de dessalage par osmose inverse (OI) au monde lorsqu\u2019elle sera achev\u00e9e au quatri\u00e8me trimestre 2021.<\/em><\/p>\r\n<p><em>Attribu\u00e9e \u00e0 un consortium d\u2019Almar Water Solutions (par l\u2019interm\u00e9diaire d\u2019Abdul Latif Jameel Enterprises), Acciona, Marubeni Corporation et Rawafid Alhadarah Holding Co, cette infrastructure de 600 millions de dollars am\u00e9ricains aura une capacit\u00e9 de production quotidienne de 450\u00a0000 m\u00e8tres cubes et garantira l\u2019approvisionnement en eau potable \u00e0 plus de 1,8 million de citoyens, tout en contribuant au d\u00e9veloppement \u00e9conomique et industriel, tant au niveau local que national.<\/em><\/p>\r\n<p><em>Reconnue dans toute l\u2019industrie de l\u2019eau comme l\u2019une des usines les plus complexes et les plus innovantes de son genre, elle a obtenu le prix \u00ab\u00a0<u>Utilities Project of the Year<\/u>\u00a0\u00bb en septembre 2019, \u00e0 l\u2019occasion des Middle East Energy Awards\u00a02019 de Duba\u00ef, aux \u00c9mirats arabes unis, ce qui en fait l\u2019un des projets d\u2019infrastructure phares de la r\u00e9gion.<\/em> En d\u00e9pit de la COVID-19, le projet a pu \u00eatre d\u00e9velopp\u00e9 gr\u00e2ce \u00e0 la livraison dans les d\u00e9lais des achats et de l\u2019ing\u00e9nierie, ainsi qu\u2019\u00e0 une s\u00e9curit\u00e9 sur site tr\u00e8s impressionnante et toujours en vigueur.<\/p>\r\n<p><em>Dans le cadre d\u2019une s\u00e9rie d\u2019entretiens avec des personnes impliqu\u00e9es dans le projet,<\/em> <a href=\"https:\/\/www.linkedin.com\/in\/luis-morales-98710750\/\"><em>Luis Morales<\/em><\/a><em>, directeur technique de Shuqaiq 3, <\/em><em>explique les complexit\u00e9s du d\u00e9veloppement et la mani\u00e8re dont l\u2019\u00e9quipe a r\u00e9ussi \u00e0 mener \u00e0 bien le projet malgr\u00e9 des bouleversement mondiaux sans pr\u00e9c\u00e9dent.<\/em><\/p>\r\n<h2>Comment les progr\u00e8s se sont-ils r\u00e9alis\u00e9s jusqu\u2019\u00e0 pr\u00e9sent et quels ont \u00e9t\u00e9 les plus grands d\u00e9fis techniques que vous avez d\u00fb relever\u00a0?<\/h2>\r\n<p>Techniquement parlant, le plus grand d\u00e9fi a \u00e9t\u00e9 celui de minimiser la consommation \u00e9lectrique et d\u2019optimiser l\u2019efficacit\u00e9 \u00e9nerg\u00e9tique de l\u2019usine, non seulement au niveau de la construction et de l\u2019exploitation, mais \u00e9galement pour que la proposition soit suffisamment comp\u00e9titive et que le projet nous soit attribu\u00e9 en premier lieu. Nous avons travaill\u00e9 en \u00e9troite collaboration avec les vendeurs et les fournisseurs pour trouver le meilleur \u00e9quipement avec la consommation d\u2019\u00e9nergie la plus faible, ainsi qu\u2019avec les ing\u00e9nieurs pour mettre en \u0153uvre un design qui permettrait d\u2019optimiser le processus. C\u2019\u00e9tait la seule fa\u00e7on pour nous d\u2019\u00e9tablir une position concurrentielle suffisamment forte pour remporter l\u2019appel d\u2019offres. Nous avons maintenant une usine hautement optimis\u00e9e et qui respecte l\u2019environnement, ce qui est extr\u00eamement important pour nous.<\/p>\r\n<h2>La pand\u00e9mie de la COVID-19 a-t-elle eu des cons\u00e9quences sur les avanc\u00e9es du projet ?<\/h2>\r\n<p>Vous ne serez pas surpris d\u2019apprendre que la pand\u00e9mie a eu un impact important sur nos progr\u00e8s. Nous avons \u00e9t\u00e9 confront\u00e9s \u00e0 beaucoup de retards potentiels. Pour \u00e9viter ces retards, nous avons \u00e9t\u00e9 tr\u00e8s proactifs, et avons travaill\u00e9 avec nos sous-traitants pour d\u00e9velopper diff\u00e9rentes solutions. Ainsi, nous avons modifi\u00e9 le processus d\u2019installation du syst\u00e8me de captage. \u00c0 l\u2019origine, nous avions pr\u00e9vu de construire le syst\u00e8me de captage depuis la mer jusqu\u2019\u00e0 la c\u00f4te. Mais nous l\u2019avons chang\u00e9 et l\u2019avons construit de la c\u00f4te vers la mer, ce qui signifiait que nous pouvions commencer \u00e0 absorber l\u2019eau avant m\u00eame de finaliser les travaux. Pour ce faire, nous avons d\u00fb changer nombre de processus, comme fournir de nouvelles zones de lancement o\u00f9 l\u2019\u00e9quipe de soudage pourrait travailler sur les tuyaux, et cela s\u2019est av\u00e9r\u00e9 \u00eatre un v\u00e9ritable d\u00e9fis.<\/p>\r\n\r\n[caption id=\"attachment_92164\" align=\"aligncenter\" width=\"2560\"]<img class=\"size-full wp-image-92164\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-Ariel.jpg\" alt=\"\" width=\"2560\" height=\"1919\" \/> Vue a\u00e9rienne des conduites d\u2019entr\u00e9e d\u2019eau de mer de Shuqaiq 3, d\u2019un diam\u00e8tre de 2\u00a0m chacune. Cr\u00e9dit photo\u00a0:\u00a9 Abdul Latif Jameel \u00c9nergie\/Almar Water Solutions.[\/caption]\r\n\r\n<h2>Vous avez mentionn\u00e9 l\u2019importance de rendre cette usine aussi \u00e9co\u00e9nerg\u00e9tique que possible. Comment avez-vous atteint cet objectif ?<\/h2>\r\n<p>L\u2019efficacit\u00e9 \u00e9nerg\u00e9tique \u00e9tait essentielle dans notre offre. Pour y parvenir, il ne suffit pas simplement de demander \u00e0 un fournisseur une pompe plus efficace ou un meilleur moteur. Nous devions \u00eatre beaucoup plus innovants au niveau des processus eux-m\u00eames. Nous avons adapt\u00e9 nos designs pour r\u00e9duire la consommation d\u2019\u00e9nergie. Nous avons travaill\u00e9 avec des fournisseurs de membranes pour adapter les membranes afin qu\u2019elles fonctionnent plus efficacement en eau de mer profonde, par exemple. Nous avons con\u00e7u un syst\u00e8me qui utilise des pompes \u00e0 haute pression install\u00e9es dans un \u00ab\u00a0cadre\u00a0\u00bb, plut\u00f4t qu\u2019individuellement. Cela nous permet de g\u00e9rer toutes les pompes en m\u00eame temps, ce qui am\u00e9liore consid\u00e9rablement l\u2019efficacit\u00e9. Nous utilisons un processus \u00e0 deux passages pour l\u2019eau, par lequel celle-ci passe deux fois \u00e0 travers les membranes. En analysant soigneusement les donn\u00e9es, nous pouvons ajuster ce processus pour trouver la meilleure distribution entre le premier et le deuxi\u00e8me passage afin d\u2019am\u00e9liorer davantage l\u2019efficacit\u00e9.<\/p>\r\n<p>De plus, nous avons travaill\u00e9 avec nos sp\u00e9cialistes techniques pour r\u00e9duire la pression de la pompe \u00e0 eau de 4,5 bars \u00e0 3,9. Cela peut sembler peu, mais en termes de quantit\u00e9 d\u2019eau que nous produisons (450 000 m\u00e8tres cubes) cette petite r\u00e9duction de pression entra\u00eene de tr\u00e8s grands gains d\u2019efficacit\u00e9 \u00e9nerg\u00e9tique.<\/p>\r\n<h2>Almar Water Solutions poss\u00e8de-t-elle suffisamment d\u2019expertise et d\u2019exp\u00e9rience pour innover de la sorte\u00a0?<\/h2>\r\n<p>Oui. Nous avons pr\u00e9c\u00e9demment travaill\u00e9 sur des projets dans le monde entier et avons pu utiliser l\u2019exp\u00e9rience et les connaissances acquises pour les mettre \u00e0 profit sur Shuqaiq 3. De plus, nous avons \u00e9tabli, au fil des ans, de solides liens avec les fournisseurs et vendeurs, qui nous aide \u00e0 rester au fait des derni\u00e8res innovations et techniques.<\/p>\r\n\r\n[caption id=\"attachment_92171\" align=\"aligncenter\" width=\"2560\"]<img class=\"size-full wp-image-92171\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-Overview.jpg\" alt=\"\" width=\"2560\" height=\"1919\" \/> Vue a\u00e9rienne du site de construction de Shuqaiq 3. Cr\u00e9dit photo\u00a0:\u00a9 Abdul Latif Jameel \u00c9nergie\/Almar Water Solutions.[\/caption]\r\n\r\n<h2>L\u2019usine de Shuqaiq 3 utilise la technologie de l\u2019osmose inverse pour produire de l\u2019eau dessal\u00e9e. Avez-vous envisag\u00e9 d\u2019autres technologies\u00a0?<\/h2>\r\n<p>Dans ce cas, le dossier d\u2019appel d\u2019offres faisait r\u00e9f\u00e9rence \u00e0 l\u2019osmose inverse. Nous n\u2019avions donc pas notre mot \u00e0 dire sur la technologie \u00e0 utiliser. Mais m\u00eame si nous l\u2019avions fait, nous aurions choisi l\u2019osmose inverse car il s\u2019agit de la technologie la plus efficace et la plus performante actuellement disponible pour le dessalage de l\u2019eau de mer.<\/p>\r\n<p>Il existe d\u2019autres technologies, mais qui tendent \u00e0 \u00eatre plus anciennes et moins efficaces, tandis que l\u2019osmose inverse devient chaque fois plus efficace et comp\u00e9titive. Il y a beaucoup d\u2019investissements dans de nouveaux mat\u00e9riaux, de nouvelles solutions et techniques pour am\u00e9liorer encore plus l\u2019efficacit\u00e9. C\u2019est passionnant de voir la fa\u00e7on dont la technologie se d\u00e9veloppe au fil des ans.<\/p>\r\n<p><img class=\"aligncenter size-full wp-image-92157\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Luis-Morales.jpg\" alt=\"\" width=\"2560\" height=\"1707\" \/><\/p>\r\n<h2>Il existe d\u00e9j\u00e0 deux autres usines de traitement d\u2019eau \u00e0 cet endroit, Shuqaiq 1 et Shuqaiq 2. La nouvelle usine se trouve entre celles-ci. Est-ce que cela a pr\u00e9sent\u00e9 des d\u00e9fis suppl\u00e9mentaires\u00a0?<\/h2>\r\n<p>Oui, en effet. Nous avons eu surtout un probl\u00e8me d\u2019espace. \u00c0 terre, nous avons beaucoup d\u2019espace, mais en mer, la quantit\u00e9 d\u2019espace est plus restreinte. Les points de captage provenant des deux autres usines se trouvent des deux c\u00f4t\u00e9s de notre usine. Nous avons donc d\u00fb \u00eatre tr\u00e8s prudents lors des travaux sous-marins. Cet aspect technique de la construction a probablement \u00e9t\u00e9 le plus difficile \u00e0 relever, non seulement parce qu\u2019il s\u2019agissait de 1,5 km d\u2019installation de conduites, mais aussi parce que nous devions \u00eatre certains de ne pas alt\u00e9rer les points de captage de Shuqaiq 1 et 2 pendant nos travaux sous-marins. Nous avons mis en place des mesures de contr\u00f4le strictes pour \u00e9viter d\u2019augmenter la turbidit\u00e9 de l\u2019eau, par exemple. Shuqaiq 2 produit \u00e9galement de l\u2019\u00e9lectricit\u00e9 ainsi que de l\u2019eau. Il y a donc beaucoup de mouvements entrants et sortants des navires qui apportent du carburant, du p\u00e9trole, etc\u2026, ce qui a \u00e9galement engendr\u00e9 des d\u00e9fis suppl\u00e9mentaires. Nous avons une bonne relation avec nos deux voisins, donc cela n\u2019a pas \u00e9t\u00e9 un probl\u00e8me, mais nous avons d\u00fb \u00eatre tr\u00e8s prudents \u00e0 tout moment.<\/p>\r\n<h2>L\u2019usine se trouve sur les rives de la mer Rouge. \u00c0 quoi ressemble l\u2019eau dans cette zone\u00a0?<\/h2>\r\n<p>L\u2019eau de la mer Rouge est magnifique, mais elle est chaude et tr\u00e8s riche en organismes. C\u2019est fantastique en termes de biodiversit\u00e9, mais cela rend le processus de dessalage plus difficile. Nous travaillons avec une temp\u00e9rature moyenne de l\u2019eau d\u2019environ 30 degr\u00e9s et le niveau \u00e9lev\u00e9 de mati\u00e8res biologiques est dangereux pour le processus. Nous devons surveiller et contr\u00f4ler constamment ce risque. D\u2019un autre c\u00f4t\u00e9, la turbidit\u00e9 est bonne, ce qui est un avantage. N\u00e9anmoins, nous le savions d\u00e8s le d\u00e9part et, gr\u00e2ce \u00e0 nos solides relations avec les autres usines \u00e0 proximit\u00e9, nous avons pu apprendre de leurs exp\u00e9riences afin de mettre en \u0153uvre des solutions efficaces \u00e0 ces probl\u00e8mes. Ainsi, pour minimiser les mati\u00e8res biologiques (bio-encrassement avec des algues, etc\u2026), nous avons mis en \u0153uvre ce que l\u2019on appelle un \u00ab syst\u00e8me de raclage \u00bb. C\u2019est l\u00e0 que nous utilisons de l\u2019eau sous pression pour tirer une \u00ab balle \u00bb en plastique le long des conduits afin de les nettoyer de toute mati\u00e8re biologique, pour pouvoir maintenir un volume constant d\u2019eau au niveau du point de captage. Nous avons \u00e9galement travaill\u00e9 avec le fournisseur de membranes pour nous assurer que nous pouvions maintenir la productivit\u00e9 avec cette temp\u00e9rature de l\u2019eau et \u00e9viter tout risque potentiel d\u2019endommagement de celles-ci.<\/p>\r\n<h2>Les membranes sont des \u00e9l\u00e9ments cruciaux du processus de dessalage. Combien de membranes utilisez-vous\u00a0?<\/h2>\r\n<p>Notre processus, en deux passages, utilise environ 54 000 membranes : 41 000 lors du premier et 13 000 lors du second. Chaque membrane a une longueur d\u2019environ 1 m. Nous parlons donc d\u2019environ 54 km de membranes au total.<\/p>\r\n\r\n[caption id=\"attachment_92185\" align=\"aligncenter\" width=\"2560\"]<img class=\"size-full wp-image-92185\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3.jpg\" alt=\"\" width=\"2560\" height=\"1707\" \/> Cuves sous pression de l\u2019osmose inverse de Shuqaiq 3. Cr\u00e9dit photo\u00a0: \u00a9 Abdul Latif Jameel \u00c9nergie\/Almar Water Solutions.[\/caption]\r\n\r\n<h2>Comment pouvons-nous comparer la productivit\u00e9 de Shuqaiq 3 \u00e0 celle des g\u00e9n\u00e9rations pr\u00e9c\u00e9dentes d\u2019usines de dessalage\u00a0?<\/h2>\r\n<p>Dans les ann\u00e9es 2000, les usines produisaient g\u00e9n\u00e9ralement entre 50 000 et 100 000 m\u00e8tres cubes. Au cours des ann\u00e9es 2010, ce chiffre a augment\u00e9 pour atteindre environ 200 000 m\u00e8tres cubes, la plus grande au monde traitant 400 000 m\u00e8tres cubes. Shuqaiq 3 traite 450 000 m\u00e8tres cubes, soit encore plus que la plus importante des usines \u00e0 ce jour, et elle se trouve probablement dans le top 10 mondial des usines exploit\u00e9es.<\/p>\r\n<p>D\u2019autres \u00e9normes usines sont en construction en Arabie saoudite, mais m\u00eame lorsqu\u2019elles seront achev\u00e9es, Shuqaiq 3 fera toujours partie des 5 plus grandes usines en termes de capacit\u00e9 de production.<\/p>\r\n<h2>Almar Water Solutions fait partie d\u2019un consortium de partenaires d\u00e9veloppant Shuqaiq 3. Quelle est l\u2019importance d\u2019une approche de partenariat dans un projet tel que celui-ci ?<\/h2>\r\n<p>Je pense que cela est essentiel. Dans notre consortium, Almar poss\u00e8de les connaissances techniques, l\u2019expertise et l\u2019exp\u00e9rience pr\u00e9alable n\u00e9cessaire \u00e0 ce type de d\u00e9veloppement. Mais un projet comme celui-ci va bien au-del\u00e0 de travaux d'ing\u00e9nierie.<\/p>\r\n<p>Il requi\u00e8re d\u2019une expertise financi\u00e8re, d\u2019une gestion de projet, d\u2019investissement, d\u2019op\u00e9rations, etc\u2026 Travailler avec d\u2019autres partenaires permet au consortium de b\u00e9n\u00e9ficier des contributions dans tous ces autres domaines d\u2019expertise compl\u00e9mentaires. Et notre partenariat a bien fonctionn\u00e9. Nous avons \u00e9tabli de solides liens au sein du consortium et cela a grandement b\u00e9n\u00e9fici\u00e9 au projet.<\/p>\r\n<p><img class=\"aligncenter size-full wp-image-92178\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-Site.jpg\" alt=\"\" width=\"2560\" height=\"1707\" \/><\/p>\r\n<h2>Les probl\u00e8mes environnementaux sont devenus beaucoup plus importants ces derni\u00e8res ann\u00e9es. Quelles mesures sont prises pour minimiser l\u2019impact environnemental de Shuqaiq 3 ?<\/h2>\r\n<p>L\u2019optimisation de la p\u00e9rennit\u00e9 de l\u2019usine est quelque chose qui s\u2019aligne pleinement sur les valeurs et la fa\u00e7on de faire des affaires d\u2019Almar Water Solutions. Nous voulons respecter l\u2019environnement \u00e0 chaque \u00e9tape, non seulement pendant la construction, mais aussi pendant l\u2019exploitation. Nous avons mis en \u0153uvre un certain nombre de mesures et de technologies pour nous aider \u00e0 y parvenir. Par exemple, cette usine dispose d\u2019une installation de traitement des boues pour traiter tous les mat\u00e9riaux que nous \u00e9liminons de l\u2019eau de mer pendant le processus de dessalage. Toutes les usines de dessalage ne disposent pas d\u2019installations telles que celle-ci. Cela signifie que tous les d\u00e9chets que nous produisons sont inoffensifs et non nocifs pour l\u2019environnement.<\/p>\r\n<p>Le syst\u00e8me de raclage que nous utilisons pour nettoyer l\u2019int\u00e9rieur des conduites est \u00e9galement respectueux de l\u2019environnement. Il s\u2019agit d\u2019un syst\u00e8me de nettoyage m\u00e9canique. Nous pouvons donc \u00e9viter d\u2019utiliser des produits chimiques pour nettoyer les conduites et la tour de captage, ce qui nous permet de restreindre la quantit\u00e9 d\u2019hypochlorite que nous utilisons.<\/p>\r\n<p>Finalement, pendant la phase de construction, nous utilisons des strat\u00e9gies plus respectueuses de l\u2019environnement marin. Ainsi, lorsque nous avons enterr\u00e9 les conduites dans les fonds marins, nous avons \u00e9limin\u00e9 beaucoup de boue. Mais au lieu de simplement vider cette boue ailleurs et de perturber l\u2019environnement marin, nous avons utilis\u00e9 des dragues \u00e0 succion pour la sortir de la mer. Nous la stockons. Nous la s\u00e9chons, puis nous l\u2019utilisons pour remblayer les tranch\u00e9es des conduites. Donc, en gros, nous la remettons \u00e0 l\u2019endroit d\u2019o\u00f9 elle provient. De m\u00eame, avec la saumure provenant de l\u2019eau dessal\u00e9e, nous la reversons dans la mer \u00e0 divers points le long d\u2019un tuyau de 200 m\u00e8tres, de sorte qu\u2019elle se disperse tr\u00e8s rapidement dans l\u2019oc\u00e9an et ne surcharge pas une zone en particulier.<\/p>\r\n<p><iframe src=\"\/\/www.youtube.com\/embed\/KITq7UXrWQE\" width=\"560\" height=\"314\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\r\n<h2>Vous avez travaill\u00e9 sur des projets Almar pr\u00e9c\u00e9dents. Y a-t-il une diff\u00e9rence entre ce projet et les autres sur lesquelles vous avez travaill\u00e9 ?<\/h2>\r\n<p>J\u2019ai travaill\u00e9 sur d\u2019autres projets d\u2019Almar \u00e0 diff\u00e9rents endroits, puis aussi sur d\u2019autres projets dans le monde entier. Chaque projet est tr\u00e8s diff\u00e9rent et d\u00e9pend des caract\u00e9ristiques locales. Shuqaiq 3 est probablement le plus m\u00e9morable de ceux-ci \u00e0 cause du probl\u00e8me additionnel de la COVID-19, notamment entre mars et septembre 2020. Il y avait des couvre-feux, des retards dans les livraisons et les personnes ne pouvaient pas voyager. Cela a \u00e9t\u00e9 un moment tr\u00e8s difficile, mais je suis tr\u00e8s fier que nous ayons pu le surmonter avec succ\u00e8s et que nous ayons continu\u00e9 \u00e0 faire avancer le projet pour respecter les d\u00e9lais cl\u00e9s. La date principale est maintenant celle de la mise en service fin octobre 2021. Je suis convaincu que nous l\u2019atteindrons.<\/p>"],"_content":[""],"_ame_cpe_post_policy":["{\"accessProtection\":{\"active\":\"replace\"}}"],"_edit_last":["22"],"_wpml_media_duplicate":["1"],"_wpml_media_featured":["1"],"_yoast_wpseo_content_score":["30"],"_yoast_wpseo_estimated-reading-time-minutes":["11"]},"_links":{"self":[{"href":"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/wp-json\/wp\/v2\/perspectives\/15013","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/wp-json\/wp\/v2\/perspectives"}],"about":[{"href":"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/wp-json\/wp\/v2\/types\/perspectives"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/wp-json\/wp\/v2\/media\/15008"}],"wp:attachment":[{"href":"https:\/\/cms.alj3.clients.lemonhq.io\/fr\/wp-json\/wp\/v2\/media?parent=15013"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}