{"id":15015,"date":"2021-09-08T00:00:00","date_gmt":"2021-09-08T00:00:00","guid":{"rendered":"https:\/\/cms.alj3.clients.lemonhq.io\/perspectives\/shuqaiq-3-desafiando-los-limites-de-la-innovacion\/"},"modified":"2026-05-12T14:18:48","modified_gmt":"2026-05-12T14:18:48","slug":"shuqaiq-3-desafiando-los-limites-de-la-innovacion","status":"publish","type":"perspectives","link":"https:\/\/cms.alj3.clients.lemonhq.io\/es\/perspectives\/shuqaiq-3-desafiando-los-limites-de-la-innovacion\/","title":{"rendered":"Shuqaiq 3: desafiando los l\u00edmites de la innovaci\u00f3n"},"content":{"rendered":"<p><em>The Shuqaiq 3 desalination plant in Jizan province in south-west Saudi Arabia will be one of the largest Reverse Osmosis (RO) desalination plants in the world when complete in the fourth quarter of 2021.<\/em><\/p>\n<p><em>Awarded to <\/em><em>a consortium of <\/em><a href=\"https:\/\/www.almarwater.com\/\"><em>Almar Water Solutions<\/em><\/a> <em>(through <\/em><a href=\"https:\/\/alj-enterprises.com\"><em>Abdul Latif Jameel Enterprises<\/em><\/a><em>), <\/em><a href=\"https:\/\/www.acciona.com\/es\/\"><em>Acciona<\/em><\/a><em>, <\/em><a href=\"https:\/\/www.marubeni.com\/en\/\"><em>Marubeni Corporation<\/em><\/a><em> and <\/em><a href=\"https:\/\/www.linkedin.com\/in\/rawafid-holding-423704140\/?originalSubdomain=sa\"><em>Rawafid Alhadarah Holding Co<\/em><\/a><em>, its <\/em><em>450,000 cubic meter daily production capacity from this US$ 600m infrastructure investment will guarantee the supply of drinking water to over 1.8 million citizens, while also contributing to economic and industrial development both locally and nationally. <\/em><\/p>\n<p><em>Recognized throughout the water industry as one of the most complex and innovative plants of its kind, in September 2019 it was named the \u2018<\/em><a href=\"https:\/\/www.alj.com\/en\/news\/shuqaiq-3-desalination-project-receives-the-utilities-project-of-the-year-award\/\"><em>Utilities Project of the Year<\/em><\/a><em>\u2019 at the Middle East Energy Awards 2019, held in Dubai, UAE, cementing its status as one of the flagship new infrastructure projects in the region. \u00a0Despite COVID-19, the project has managed to stay on track, with procurement and engineering kept on time and a very impressive \u2013 and ongoing \u2013 site safety record.<\/em><\/p>\n<p><em>As part of a series of interviews with people involved in the project,<\/em> <a href=\"https:\/\/www.linkedin.com\/in\/luis-morales-98710750\/\"><em>Luis Morales<\/em><\/a><em>, Technical Director at Shuqaiq 3, <\/em><em>discusses the complexities of the development and how the team has successfully kept the project on track despite unprecedented global disruption.<\/em><\/p>\n<h2>How has progress been so far and what have been the biggest technical challenges you\u2019ve had to address?<\/h2>\n<p>Technically speaking, the biggest challenge was minimizing the electrical consumption and optimizing the energy efficiency of the plant, not only for the construction and operation, but for the tender to be competitive enough to be awarded the project in the first place. \u00a0We\u2019ve worked closely with vendors and suppliers to find the best equipment with the lowest energy consumption, as well as with the engineers to implement a design which could optimize the process. \u00a0It was the only way we could build a strong enough competitive position to win the tender. \u00a0Now we have a plant which is highly optimized and respects the environment, which is extremely important to us.<\/p>\n<h2>How was the progress of the project effect by the COVID-19 pandemic?<\/h2>\n<p>It won\u2019t surprise you to know that the pandemic had a big impact on our progress. \u00a0We faced a lot of potential delays. \u00a0To avoid these delays, we were very proactive, and we worked with our contractors to develop different solutions. \u00a0For example, we changed the process for installing the intake. \u00a0We had originally planned to construct the intake from the sea to the shore. \u00a0But we switched it around and built it from the shore to the sea instead, which meant we could start taking in water even before finalizing the works. \u00a0To do that, we had to change a lot of processes, such as providing new launch areas where the welding team could work on the pipes, and that was very challenging.<\/p>\n<div id=\"attachment_92161\" style=\"width: 2570px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-92161\" class=\"size-full wp-image-92161\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-Ariel-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1919\" \/><p id=\"caption-attachment-92161\" class=\"wp-caption-text\">Aerial view of the Shuqaiq 3 seawater inlet pipes, each 2m in diameter.\u00a0 Photo Credit \u00a9 Abdul Latif Jameel Energy\/Almar Water Solutions<\/p><\/div>\n<h2>You mentioned the importance of making this plant as energy efficient as possible. How did you achieve this?<\/h2>\n<p>Energy efficiency was essential to our bid. \u00a0To achieve it, it\u2019s not enough to simply ask a supplier for a more efficient pump or a better motor. \u00a0We had to be a lot more innovative in terms of the processes themselves. \u00a0We adapted our designs to reduce energy consumption. \u00a0We worked with membrane suppliers to adapt the membranes so they would function more efficiently in deep seawater, for example. \u00a0We designed a system that uses high pressure pumps installed in a \u2018frame\u2019, rather than individually. \u00a0This allows us to manage all the pumps at the same time, which significantly improves efficiency. \u00a0We use a two-pass process for the water, whereby it passes through the membranes twice. \u00a0By carefully analyzing the data, we can tweak this process to find the perfect distribution between the first and the second pass to improve efficiency even more.<\/p>\n<p>In addition, we worked with our technical specialists to reduce the water pump pressure from 4.5 bars to 3.9. This may not seem like a lot, but in terms of the amount of water we produce &#8211; 450,000 cubic meters &#8211; this small reduction in pressure results in very big gains in energy efficiency.<\/p>\n<h2>Does Almar Water Solutions have strong expertise and experience to enable it to innovate in this way?<\/h2>\n<p>Yes, we\u2019ve previously worked on projects all over the world and we\u2019ve been able to use the experience and knowledge we\u2019ve gained to benefit Shuqaiq 3.\u00a0 Also, the strong relationships we have built up over the years with vendors and suppliers helps us keep on top of the latest innovations and techniques.<\/p>\n<div id=\"attachment_92168\" style=\"width: 2570px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-92168\" class=\"size-full wp-image-92168\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-Overview-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1919\" \/><p id=\"caption-attachment-92168\" class=\"wp-caption-text\">Aerial view of the Shuqaiq 3 construction site. Photo Credit \u00a9 Abdul Latif Jameel Energy\/Almar Water Solutions<\/p><\/div>\n<h2>Shuqaiq 3 uses Reverse Osmosis technology to produce desalinated water. Were other technologies considered?<\/h2>\n<p>In this case, the tender documents specified reverse osmosis, so we did not have any say in which technology was used. \u00a0But even if we did, we would have chosen Reverse Osmosis because it\u2019s the most efficient and the best technology currently available for desalinating seawater.<\/p>\n<p>There are other technologies, but they tend be older and less efficient, whereas Reverse Osmosis is getting more efficient and more competitive all the time.\u00a0 There is a lot of investment into new materials, new solutions and techniques for improving the efficiency even further.\u00a0 It\u2019s quite exciting to see how the technology develops over the next few years.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-92154\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Luis-Morales-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1707\" \/><\/p>\n<h2>There are already two other water plants in that location, Shuqaiq 1 and Shuqaiq 2. The new plant sits between them. Did this present any additional challenges?<\/h2>\n<p>Yes, it did, principally one of space. \u00a0On shore, we have plenty of space, but offshore, the amount of space is more restricted. \u00a0The intakes from the other two plants lie on both sides of our plant, so we had to be very careful during the marine works.\u00a0 That was probably the most technically challenging aspect of the construction, not only because it is 1.5km of pipe installation, but also because we have to be sure that we are not impacting the intakes of Shuqaiq 1 and 2 during our marine works.\u00a0 We put in place strict control measures to avoid increasing turbidity in the water, for example. \u00a0Shuqaiq 2 also produces power as well as water, so there are quite a lot of ship movements in and out, bringing in fuel, oil and so forth, which also created additional challenges.\u00a0 We have a good relationship with both our neighbors, so it wasn\u2019t a problem, but we had to be very careful at all times.<\/p>\n<h2>The plant is on the shores of the Red Sea. What is the water like in that area?<\/h2>\n<p>The water in the Red Sea is beautiful, but it is warm and very rich in organisms. \u00a0It is fantastic in terms of biodiversity but makes the desalination process more difficult. \u00a0We are working with an average water temperature of around 30 degrees and the high level of biological growth is dangerous for the process. \u00a0We have to constantly monitor and control this risk.\u00a0 On the other hand, the turbidity is good, which is an advantage. \u00a0However, we knew this from the outset and, thanks to our strong relationships with the other plants nearby, we have been able to learn from their experiences to implement effective solutions to these problems. \u00a0For example, to minimize biological growth (biofouling with algae, etc.) we are implementing a so-called \u2018pigging system\u2019. \u00a0This is where we use pressurized water to fire a plastic \u2018bullet\u2019 along the pipes to clean the biological growth off the inside, so we can maintain a consistent volume of water in the intake. \u00a0We have also been working with the membrane supplier to ensure we can maintain productivity at this water temperature and avoid any potential risk of damaging the membranes.<\/p>\n<h2>Membranes are a crucial part of the desalination process. How many membranes do you use?<\/h2>\n<p>Our process uses around 54,000 membranes in two passes: 41,000 in the first and 13,000 in the second. \u00a0Each membrane is around 1m in length, so we are talking about 54km of membranes in total.<\/p>\n<div id=\"attachment_92182\" style=\"width: 2570px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-92182\" class=\"size-full wp-image-92182\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1707\" \/><p id=\"caption-attachment-92182\" class=\"wp-caption-text\">The Reverse Osmosis pressure vessels at Shuqaiq 3.\u00a0 Photo Credit: \u00a9 Abdul Latif Jameel Energy\/Almar Water solutions.<\/p><\/div>\n<h2>How does the productivity of Shuqaiq 3 compare to previous generations of desalination plants?<\/h2>\n<p>In the 2000s, plants usually produced between 50,000 cubic meters and 100,000 cubic meters. \u00a0By the 2010s, this had increased to around 200,000, with the biggest one in the world achieving 400,000 cubic meters.\u00a0 Shuqaiq 3 is 450,000 cubic meters \u2013 so even bigger than the then biggest to date and still probably in the world top 10 of commissioned plants.<\/p>\n<p>They are building some other huge plants in Saudi Arabia, but even when they are completed, Shuqaiq 3 will still be in the top 5 biggest plants in terms of production capacity.<\/p>\n<h2>Almar Water Solutions is part of a consortium of partners developing Shuqaiq 3. How important is a partnership approach in a project like this?<\/h2>\n<p>I think it is essential. \u00a0In our consortium, Almar has the technical knowledge, expertise and previous experience of this kind of development. \u00a0But a project like this is about much more than construction.<\/p>\n<p>It needs finance expertise, project management, investment, operations, and so on. \u00a0Working with other partners means the consortium benefits from bringing in all these other complementary areas of expertise. \u00a0And our partnership has worked well. \u00a0We have built strong relationships within the consortium, and this has benefitted the project enormously.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-92175\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-Site-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1707\" \/><\/p>\n<h2>Environmental issues have become much more important in recent years. What measures are being taken to minimize the environmental impact of Shuqaiq 3?<\/h2>\n<p>Optimizing the sustainability of the plant is something that fully aligns with own values and way of doing business at Almar Water Solutions.\u00a0 We want to respect the environment at every stage, not only during construction, but also during operation. \u00a0We have implemented a number of measures and technologies to help us achieve this. \u00a0For example, this plant has a sludge treatment facility to treat all the material we remove from the seawater during desalination. \u00a0Not all desalination plants have a facility like this. \u00a0It means that all the waste we produce is innocuous and not harmful to the environment.<\/p>\n<p>The pigging system we use to clean the inside of the pipes is also environmentally friendly. \u00a0It is a mechanical cleaning system, which means we can avoid using chemicals to clean out the intake pipes and intake tower, so we can limit the amount of hypochlorite we use.<\/p>\n<p>Finally, during the construction phase, we are using strategies that are more respectful to the marine environment. \u00a0For example, when we buried the pipes in the sea floor, we removed a lot of mud. \u00a0But instead of just dumping this mud somewhere else and disrupting the marine environment, we used sucker dredgers to take this material out of the sea.\u00a0 We store it. \u00a0We dry it, and then we use it to backfill the pipe trenches \u2013 so essentially, we are putting it back in the location it came from. \u00a0Similarly, with the brine from the desalinated water, we disperse it back into the sea at various points along a 200 meter pipe, so it disperses very quickly in the ocean and does not overload one particular area.<\/p>\n<p><iframe loading=\"lazy\" src=\"\/\/www.youtube.com\/embed\/KITq7UXrWQE\" width=\"560\" height=\"314\" allowfullscreen=\"allowfullscreen\" data-mce-fragment=\"1\"><\/iframe><\/p>\n<h2>You have worked on previous Almar projects. How does this one compare to others you have worked on?<\/h2>\n<p>I\u2019ve worked on previous Almar projects in other locations, and also for other projects around the world in my previous lives. \u00a0Each one is very different, depending on the local circumstances.\u00a0 Shuqaiq 3 is probably the most memorable because it\u00a0 had the added complication of the COVID-19 situation, particularly from March to September 2020.\u00a0 There were curfews, delays in supplies, people couldn\u2019t travel.\u00a0 It was a very difficult at time, but I\u2019m very proud that we made it through successfully and kept the project moving forward to meet its key dates.\u00a0 The main key date now is the commissioning date at the end of October 2021, but I\u2019m confident we will achieve it.<\/p>\n","protected":false},"featured_media":15008,"menu_order":0,"template":"","class_list":["post-15015","perspectives","type-perspectives","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Shuqaiq 3: desafiando los l\u00edmites de la innovaci\u00f3n - Abdul Latif Jameel<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Shuqaiq 3: desafiando los l\u00edmites de la innovaci\u00f3n - Abdul Latif Jameel\" \/>\n<meta property=\"og:description\" content=\"The Shuqaiq 3 desalination plant in Jizan province in south-west Saudi Arabia will be one of the largest Reverse Osmosis (RO) desalination plants in the world when complete in the fourth quarter of 2021. Awarded to a consortium of Almar Water Solutions (through Abdul Latif Jameel Enterprises), Acciona, Marubeni Corporation and Rawafid Alhadarah Holding Co, [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cms.alj3.clients.lemonhq.io\/es\/perspectives\/shuqaiq-3-desafiando-los-limites-de-la-innovacion\/\" \/>\n<meta property=\"og:site_name\" content=\"Abdul Latif Jameel\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-12T14:18:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minuto\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/cms.alj3.clients.lemonhq.io\/es\/perspectives\/shuqaiq-3-desafiando-los-limites-de-la-innovacion\/\",\"url\":\"https:\/\/cms.alj3.clients.lemonhq.io\/es\/perspectives\/shuqaiq-3-desafiando-los-limites-de-la-innovacion\/\",\"name\":\"Shuqaiq 3: desafiando los l\u00edmites de la innovaci\u00f3n - Abdul Latif Jameel\",\"isPartOf\":{\"@id\":\"https:\/\/10.0.2.222\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/cms.alj3.clients.lemonhq.io\/es\/perspectives\/shuqaiq-3-desafiando-los-limites-de-la-innovacion\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/cms.alj3.clients.lemonhq.io\/es\/perspectives\/shuqaiq-3-desafiando-los-limites-de-la-innovacion\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg\",\"datePublished\":\"2021-09-08T00:00:00+00:00\",\"dateModified\":\"2026-05-12T14:18:48+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/cms.alj3.clients.lemonhq.io\/es\/perspectives\/shuqaiq-3-desafiando-los-limites-de-la-innovacion\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/cms.alj3.clients.lemonhq.io\/es\/perspectives\/shuqaiq-3-desafiando-los-limites-de-la-innovacion\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/cms.alj3.clients.lemonhq.io\/es\/perspectives\/shuqaiq-3-desafiando-los-limites-de-la-innovacion\/#primaryimage\",\"url\":\"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg\",\"contentUrl\":\"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg\",\"width\":2560,\"height\":1707},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/cms.alj3.clients.lemonhq.io\/es\/perspectives\/shuqaiq-3-desafiando-los-limites-de-la-innovacion\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/10.0.2.222\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Shuqaiq 3: desafiando los l\u00edmites de la innovaci\u00f3n\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/10.0.2.222\/en\/#website\",\"url\":\"https:\/\/10.0.2.222\/en\/\",\"name\":\"Abdul Latif Jameel\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/10.0.2.222\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Shuqaiq 3: desafiando los l\u00edmites de la innovaci\u00f3n - Abdul Latif Jameel","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"es_ES","og_type":"article","og_title":"Shuqaiq 3: desafiando los l\u00edmites de la innovaci\u00f3n - Abdul Latif Jameel","og_description":"The Shuqaiq 3 desalination plant in Jizan province in south-west Saudi Arabia will be one of the largest Reverse Osmosis (RO) desalination plants in the world when complete in the fourth quarter of 2021. Awarded to a consortium of Almar Water Solutions (through Abdul Latif Jameel Enterprises), Acciona, Marubeni Corporation and Rawafid Alhadarah Holding Co, [&hellip;]","og_url":"https:\/\/cms.alj3.clients.lemonhq.io\/es\/perspectives\/shuqaiq-3-desafiando-los-limites-de-la-innovacion\/","og_site_name":"Abdul Latif Jameel","article_modified_time":"2026-05-12T14:18:48+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Tiempo de lectura":"1 minuto"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/cms.alj3.clients.lemonhq.io\/es\/perspectives\/shuqaiq-3-desafiando-los-limites-de-la-innovacion\/","url":"https:\/\/cms.alj3.clients.lemonhq.io\/es\/perspectives\/shuqaiq-3-desafiando-los-limites-de-la-innovacion\/","name":"Shuqaiq 3: desafiando los l\u00edmites de la innovaci\u00f3n - Abdul Latif Jameel","isPartOf":{"@id":"https:\/\/10.0.2.222\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cms.alj3.clients.lemonhq.io\/es\/perspectives\/shuqaiq-3-desafiando-los-limites-de-la-innovacion\/#primaryimage"},"image":{"@id":"https:\/\/cms.alj3.clients.lemonhq.io\/es\/perspectives\/shuqaiq-3-desafiando-los-limites-de-la-innovacion\/#primaryimage"},"thumbnailUrl":"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg","datePublished":"2021-09-08T00:00:00+00:00","dateModified":"2026-05-12T14:18:48+00:00","breadcrumb":{"@id":"https:\/\/cms.alj3.clients.lemonhq.io\/es\/perspectives\/shuqaiq-3-desafiando-los-limites-de-la-innovacion\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cms.alj3.clients.lemonhq.io\/es\/perspectives\/shuqaiq-3-desafiando-los-limites-de-la-innovacion\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/cms.alj3.clients.lemonhq.io\/es\/perspectives\/shuqaiq-3-desafiando-los-limites-de-la-innovacion\/#primaryimage","url":"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg","contentUrl":"https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled.jpg","width":2560,"height":1707},{"@type":"BreadcrumbList","@id":"https:\/\/cms.alj3.clients.lemonhq.io\/es\/perspectives\/shuqaiq-3-desafiando-los-limites-de-la-innovacion\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/10.0.2.222\/en\/"},{"@type":"ListItem","position":2,"name":"Shuqaiq 3: desafiando los l\u00edmites de la innovaci\u00f3n"}]},{"@type":"WebSite","@id":"https:\/\/10.0.2.222\/en\/#website","url":"https:\/\/10.0.2.222\/en\/","name":"Abdul Latif Jameel","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/10.0.2.222\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"}]}},"post-meta-fields":{"_wp_page_template":["default"],"_published_date":["field_6057129b493f5"],"published_date":["20210908"],"_location":["field_601267396ce72"],"location":["Jizan, Arabia Saudita"],"_featured":["field_601a3b473c5c5"],"featured":["0"],"_footnotes":["field_66fd39afb9383"],"footnotes":[""],"_business_sector":["field_66f6b5bcac8cb"],"business_sector":["Energ\u00eda"],"_content_series":["field_66fe3c439f8f6"],"content_series":[""],"_old_post_id":["field_66fe3fd59f8f7"],"old_post_id":["92217"],"_short_title":["field_60925d67125ef"],"short_title":["Shuqaiq 3: desafiando los l\u00edmites de la innovaci\u00f3n"],"_summary":["field_6019304103a20"],"summary":["<p>Como parte de una serie de entrevistas con las personas involucradas en el proyecto, Luis Morales, director t\u00e9cnico de Shuqaiq 3, repasa las complejidades del desarrollo y c\u00f3mo el equipo ha logrado mantener en marcha el proyecto con \u00e9xito, a pesar de una disrupci\u00f3n global sin precedentes.<\/p>"],"_mobile_featured_image":["field_66f6b4bee65f3"],"mobile_featured_image":["https:\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-Shuqaiq-3-scaled-1.jpg"],"_push_notification":["field_66f6b47de65f1"],"push_notification":[""],"_publish_mobile":["field_66f6b491e65f2"],"publish_mobile":["0"],"_status":["field_652694983fe12"],"status":["publish"],"_thumbnail_id":["15008"],"_wpml_word_count":["{\"total\":2114,\"to_translate\":{\"ar\":2114,\"zh-hans\":2114,\"fr\":2114,\"ja\":2114,\"es\":2114,\"tr\":2114}}"],"_last_translation_edit_mode":["native-editor"],"amazonS3_cache":["a:10:{s:85:\"\/\/cms.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-Ariel-scaled-1.jpg\";a:2:{s:2:\"id\";s:4:\"8505\";s:11:\"source_type\";s:13:\"media-library\";}s:87:\"\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-Ariel-scaled-1.jpg\";a:2:{s:2:\"id\";s:4:\"8505\";s:11:\"source_type\";s:13:\"media-library\";}s:88:\"\/\/cms.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-Overview-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17518\";s:11:\"source_type\";s:13:\"media-library\";}s:90:\"\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-Overview-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17518\";s:11:\"source_type\";s:13:\"media-library\";}s:82:\"\/\/cms.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17519\";s:11:\"source_type\";s:13:\"media-library\";}s:84:\"\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Luis-Morales-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17519\";s:11:\"source_type\";s:13:\"media-library\";}s:79:\"\/\/cms.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17520\";s:11:\"source_type\";s:13:\"media-library\";}s:81:\"\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17520\";s:11:\"source_type\";s:13:\"media-library\";}s:84:\"\/\/cms.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-Site-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17521\";s:11:\"source_type\";s:13:\"media-library\";}s:86:\"\/\/media.alj3.clients.lemonhq.io\/wp-content\/uploads\/2024\/10\/Shuqaiq-3-Site-scaled-2.jpg\";a:2:{s:2:\"id\";s:5:\"17521\";s:11:\"source_type\";s:13:\"media-library\";}}"],"_edit_lock":["1778595596:22"],"content":["<p><em>Cuando se complete en el cuarto trimestre de 2021, la planta de desalinizaci\u00f3n Shuqaiq 3, en la provincia de Jizan, en el suroeste de Arabia Saud\u00ed, ser\u00e1 una de las plantas de desalinizaci\u00f3n de \u00f3smosis inversa (RO) m\u00e1s grandes del mundo.<\/em><\/p>\r\n<p><em>La capacidad de producci\u00f3n diaria de 450\u00a0000 metros c\u00fabicos de esta inversi\u00f3n en infraestructura de 600\u00a0millones de USD adjudicada a un consorcio de <\/em><a href=\"https:\/\/www.almarwater.com\/\"><em>Almar Water Solutions<\/em><\/a> <em>(a trav\u00e9s de <\/em><a href=\"https:\/\/alj-enterprises.com\"><em>Abdul Latif Jameel Enterprises<\/em><\/a><em>), <\/em><a href=\"https:\/\/www.acciona.com\/es\/\"><em>Acciona<\/em><\/a><em>, <\/em><a href=\"https:\/\/www.marubeni.com\/en\/\"><em>Marubeni Corporation<\/em><\/a><em> y <\/em><a href=\"https:\/\/www.linkedin.com\/in\/rawafid-holding-423704140\/?originalSubdomain=sa\"><em>Rawafid Alhadarah Holding Co<\/em><\/a><em>,<\/em> <em>garantizar\u00e1 un suministro de agua potable a m\u00e1s de 1,8\u00a0millones de ciudadanos, a la vez que contribuir\u00e1 al desarrollo econ\u00f3mico e industrial tanto a nivel local como nacional.<\/em><\/p>\r\n<p><em>Reconocida en todo el sector del agua como una de las plantas m\u00e1s complejas e innovadoras de su clase, en septiembre de 2019 fue nombrada \u201c<\/em><a href=\"https:\/\/www.alj.com\/en\/news\/shuqaiq-3-desalination-project-receives-the-utilities-project-of-the-year-award\/\"><em>Proyecto de servicios p\u00fablicos del a\u00f1o<\/em><\/a><em>\u201d en los Premios de la energ\u00eda de Oriente Medio 2019, celebrados en Dub\u00e1i, EAU, lo que afianz\u00f3 su estatus como uno de los nuevos proyectos insignia de infraestructura en la regi\u00f3n. A pesar de la COVID-19, el proyecto ha logrado mantenerse en el buen camino, con adquisiciones y procesos de ingenier\u00eda realizados a tiempo, as\u00ed como un registro de seguridad impresionante de forma continua.<\/em><\/p>\r\n<p><em>Como parte de una serie de entrevistas con las personas involucradas en el proyecto,<\/em> <a href=\"https:\/\/www.linkedin.com\/in\/luis-morales-98710750\/\"><em>Luis Morales<\/em><\/a><em>, director t\u00e9cnico de Shuqaiq 3, <\/em><em>repasa las complejidades del desarrollo y c\u00f3mo el equipo ha logrado mantener en marcha el proyecto con \u00e9xito, a pesar de una disrupci\u00f3n global sin precedentes.<\/em><\/p>\r\n<h2>\u00bfC\u00f3mo ha sido el progreso hasta ahora y cu\u00e1les han sido los mayores desaf\u00edos t\u00e9cnicos que ha tenido que abordar?<\/h2>\r\n<p>Desde el punto de vista t\u00e9cnico, el mayor reto fue minimizar el consumo el\u00e9ctrico y optimizar la eficiencia energ\u00e9tica de la planta, no solo para la construcci\u00f3n y la operaci\u00f3n, sino tambi\u00e9n para que la licitaci\u00f3n fuera lo suficientemente competitiva como para que se nos concediera el proyecto en primer lugar. Hemos trabajado estrechamente con distribuidores y proveedores para encontrar el mejor equipo con el menor consumo de energ\u00eda, as\u00ed como con los ingenieros para implementar un dise\u00f1o que pudiese optimizar el proceso. Esta era la \u00fanica manera de lograr una posici\u00f3n competitiva lo suficientemente fuerte como para ganar la licitaci\u00f3n. Ahora tenemos una planta altamente optimizada que respeta el medioambiente, lo cual es extremadamente importante para nosotros.<\/p>\r\n<h2>\u00bfC\u00f3mo afect\u00f3 la pandemia de COVID-19 al avance del proyecto?<\/h2>\r\n<p>Como seguramente se imagine, la pandemia tuvo un gran impacto en nuestro progreso. Nos enfrentamos a muchos retrasos potenciales. Para evitarlos, tuvimos que actuar de manera extremadamente proactiva y colaboramos con nuestros contratistas para desarrollar diferentes soluciones. Por ejemplo, cambiamos el proceso de instalaci\u00f3n de la toma. Originalmente ten\u00edamos planeado construirla desde el mar a la costa. Sin embargo, finalmente la construimos de la costa al mar, lo que nos permiti\u00f3 empezar a absorber agua incluso antes de terminar las obras. Para ello, tuvimos que cambiar muchos procesos y, entre otras cosas, proporcionar nuevas plataformas para que el equipo de soldadura pudiera trabajar en las tuber\u00edas, lo que result\u00f3 especialmente complicado.<\/p>\r\n\r\n[caption id=\"attachment_92166\" align=\"aligncenter\" width=\"2560\"]<img class=\"size-full wp-image-92166\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-Ariel.jpg\" alt=\"\" width=\"2560\" height=\"1919\" \/> Vista a\u00e9rea de las tuber\u00edas para la entrada de agua del mar en Shuqaiq\u00a03, cada una de 2\u00a0metros de di\u00e1metro. Cr\u00e9dito de la foto: \u00a9 Abdul Latif Jameel Energy\/Almar Water Solutions[\/caption]\r\n\r\n<h2>Ha mencionado la importancia de hacer esta planta lo m\u00e1s eficiente energ\u00e9ticamente posible. \u00bfC\u00f3mo lo consigui\u00f3?<\/h2>\r\n<p>La eficiencia energ\u00e9tica fue esencial para nuestra propuesta. Para lograrla no basta con pedir simplemente a un proveedor una bomba m\u00e1s eficiente o un motor mejor, ten\u00edamos que ser mucho m\u00e1s innovadores en t\u00e9rminos de procesos. Adaptamos nuestros dise\u00f1os para reducir el consumo de energ\u00eda. Por ejemplo, trabajamos con proveedores de membranas para adaptarlas y que funcionaran de forma m\u00e1s eficiente en aguas marinas profundas. Hemos dise\u00f1ado un sistema que utiliza bombas de alta presi\u00f3n instaladas en un \u201cmarco\u201d, en lugar de individualmente. Esto nos permite gestionar todas las bombas al mismo tiempo, lo que mejora significativamente la eficiencia. Empleamos un proceso doble, en el que el agua pasa dos veces a trav\u00e9s de las membranas. Al analizar cuidadosamente los datos, podemos ajustar este proceso para encontrar la distribuci\u00f3n perfecta entre la primera y la segunda pasada, mejorando a\u00fan m\u00e1s la eficiencia.<\/p>\r\n<p>Adem\u00e1s, trabajamos con nuestros especialistas t\u00e9cnicos para reducir la presi\u00f3n de la bomba de agua de 4,5 a 3,9 bares. Esto puede parecer poco, pero teniendo en cuenta que producimos 450 000 metros c\u00fabicos de agua, esta peque\u00f1a reducci\u00f3n de la presi\u00f3n da como resultado grandes avances en la eficiencia energ\u00e9tica.<\/p>\r\n<h2>\u00bfAlmar Water Solutions tiene gran experiencia y conocimientos suficientes para innovar de esta manera?<\/h2>\r\n<p>S\u00ed, anteriormente hemos trabajado en proyectos por todo el mundo, as\u00ed que hemos podido aprovechar la experiencia y los conocimientos que hemos adquirido para beneficiar a Shuqaiq 3. Adem\u00e1s, las s\u00f3lidas relaciones que hemos desarrollado a lo largo de los a\u00f1os con proveedores y distribuidores nos ayudan a mantenernos al d\u00eda de las \u00faltimas innovaciones y t\u00e9cnicas.<\/p>\r\n\r\n[caption id=\"attachment_92173\" align=\"aligncenter\" width=\"2560\"]<img class=\"size-full wp-image-92173\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-Overview.jpg\" alt=\"\" width=\"2560\" height=\"1919\" \/> Vista a\u00e9rea de la construcci\u00f3n de Shuqaiq 3. Cr\u00e9dito de la foto: \u00a9 Abdul Latif Jameel Energy\/Almar Water Solutions[\/caption]\r\n\r\n<h2>Shuqaiq 3 utiliza tecnolog\u00eda de \u00f3smosis inversa para producir agua desalinizada. \u00bfSe tuvieron en cuenta otras tecnolog\u00edas?<\/h2>\r\n<p>En este caso, los documentos de la licitaci\u00f3n especificaban la \u00f3smosis inversa, as\u00ed que no pod\u00edamos decidir por nuestra cuenta qu\u00e9 tecnolog\u00eda utiliz\u00e1bamos. No obstante, si pudi\u00e9ramos haberlo hecho, habr\u00edamos elegido tambi\u00e9n la \u00f3smosis inversa, que actualmente es la mejor y m\u00e1s eficiente entre las tecnolog\u00edas disponibles para desalinizar el agua de mar.<\/p>\r\n<p>Existen otras tecnolog\u00edas, pero tienden a ser m\u00e1s antiguas y menos eficaces, a diferencia de la \u00f3smosis inversa, que es cada vez m\u00e1s eficiente y competitiva. Se invierte mucho en nuevos materiales, soluciones y t\u00e9cnicas para mejorar a\u00fan m\u00e1s la eficiencia. Es muy emocionante ver c\u00f3mo se ir\u00e1 desarrollando esta tecnolog\u00eda en los pr\u00f3ximos a\u00f1os.<\/p>\r\n<p><img class=\"aligncenter size-full wp-image-92159\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Luis-Morales.jpg\" alt=\"\" width=\"2560\" height=\"1707\" \/><\/p>\r\n<h2>En esa ubicaci\u00f3n ya hay otras dos plantas de agua, Shuqaiq 1 y Shuqaiq 2. La nueva planta se encuentra entre ellas. \u00bfPresent\u00f3 esto alg\u00fan desaf\u00edo adicional?<\/h2>\r\n<p>S\u00ed, principalmente en el espacio. En tierra tenemos mucho espacio, pero en alta mar es m\u00e1s limitado. Las tomas de las otras dos plantas se encuentran a ambos lados de la nuestra, as\u00ed que tuvimos que tener mucho cuidado durante las obras marinas. A nivel t\u00e9cnico, este fue probablemente el aspecto m\u00e1s desafiante de la construcci\u00f3n: no solo tuvimos que instalar 1,5 km de tuber\u00edas, sino que tambi\u00e9n nos vimos obligados a asegurarnos de no perjudicar las tomas de Shuqaiq 1 y 2. Ponemos en pr\u00e1ctica estrictas medidas de control para evitar, por ejemplo, el aumento de la turbidez en el agua. Adem\u00e1s, Shuqaiq 2 produce tanto energ\u00eda como agua, as\u00ed que hay muchos movimientos de barcos que entran y salen. Esto conlleva restos de combustible, petr\u00f3leo, etc., lo que tambi\u00e9n supuso un reto adicional. Tenemos buena relaci\u00f3n con nuestros vecinos, as\u00ed que no fue un problema, pero tuvimos que ser muy cuidadosos en todo momento.<\/p>\r\n<h2>La planta est\u00e1 a orillas del mar Rojo. \u00bfC\u00f3mo es el agua en esa zona?<\/h2>\r\n<p>El agua en el mar Rojo es hermosa, pero est\u00e1 caliente y es muy rica en organismos. Esto es fant\u00e1stico en t\u00e9rminos de biodiversidad, pero complica el proceso de desalinizaci\u00f3n. Trabajamos con agua a una temperatura media de unos 30 grados y el alto nivel de crecimiento biol\u00f3gico es peligroso para el proceso, as\u00ed que tenemos que supervisar y controlar constantemente este riesgo. Por otro lado, la turbidez es buena, lo que supone una ventaja. Fuimos conscientes de esto desde el principio, as\u00ed que pudimos aprovechar nuestras s\u00f3lidas relaciones con las otras plantas para aprender de sus experiencias e implementar soluciones eficaces. Por ejemplo, para minimizar el crecimiento biol\u00f3gico (bioensuciamiento con algas, etc.) estamos implementando lo que se conoce como un \u201csistema de pigging\u201d. Utilizamos agua presurizada para disparar una \u201cbala\u201d de pl\u00e1stico a lo largo de las tuber\u00edas y as\u00ed limpiar el crecimiento biol\u00f3gico del interior para mantener un volumen constante de agua en la toma. Tambi\u00e9n hemos trabajado con el proveedor de membranas para garantizar que podemos mantener la productividad con agua a esta temperatura y evitar cualquier riesgo potencial que pudiese da\u00f1ar las membranas.<\/p>\r\n<h2>Las membranas son una parte crucial del proceso de desalinizaci\u00f3n. \u00bfCu\u00e1ntas membranas se utilizan?<\/h2>\r\n<p>Nuestro proceso utiliza alrededor de 54\u00a0000 membranas en las dos pasadas: 41\u00a0000 en la primera y 13\u00a0000 en la segunda. Cada membrana tiene alrededor de 1\u00a0m de longitud, as\u00ed que estamos hablando de un total de 54\u00a0km de membranas.<\/p>\r\n\r\n[caption id=\"attachment_92187\" align=\"aligncenter\" width=\"2560\"]<img class=\"size-full wp-image-92187\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3.jpg\" alt=\"\" width=\"2560\" height=\"1707\" \/> Los recipientes a presi\u00f3n de \u00f3smosis inversa en Shuqaiq 3. Cr\u00e9dito de la fotograf\u00eda: \u00a9 Abdul Latif Jameel Energy\/Almar Water Solutions.[\/caption]\r\n\r\n<h2>\u00a0\u00bfC\u00f3mo es la productividad de Shuqaiq 3 en comparaci\u00f3n con las generaciones anteriores de plantas de desalinizaci\u00f3n?<\/h2>\r\n<p>En la d\u00e9cada de 2000 las plantas normalmente produc\u00edan entre 50\u00a0000 y 100\u00a0000 metros c\u00fabicos. En la d\u00e9cada de 2010 esta cifra aument\u00f3 hasta cerca de 200\u00a0000 y la m\u00e1s grande del mundo llegaba a los 400\u00a0000\u00a0metros c\u00fabicos. Shuqaiq\u00a03 es capaz de producir 450\u00a0000 metros c\u00fabicos, por lo que es incluso mayor que la m\u00e1s grande hasta la fecha y probablemente a\u00fan est\u00e9 entre las 10\u00a0mejores plantas del mundo.<\/p>\r\n<p>En Arabia Saud\u00ed se est\u00e1n construyendo otras plantas enormes pero, incluso cuando se terminen, Shuqaiq 3 seguir\u00e1 estando entre las 5\u00a0plantas m\u00e1s grandes en t\u00e9rminos de capacidad de producci\u00f3n.<\/p>\r\n<h2>Almar Water Solutions forma parte del consorcio de socios que desarrollan Shuqaiq 3. \u00bfQu\u00e9 importancia tiene un enfoque de asociaci\u00f3n para un proyecto como este?<\/h2>\r\n<p>Creo que es esencial. En nuestro consorcio, Almar tiene conocimientos t\u00e9cnicos y experiencia previa en desarrollos de este tipo. Sin embargo, un proyecto como este implica mucho m\u00e1s que construcci\u00f3n.<\/p>\r\n<p>Se necesita experiencia financiera, gesti\u00f3n de proyectos, inversi\u00f3n, operaciones, etc. Trabajar con otros socios beneficia al consorcio, ya que se incorpora experiencia en todas estas otras \u00e1reas complementarias. Nuestra asociaci\u00f3n ha funcionado bien. Hemos forjado relaciones s\u00f3lidas dentro del consorcio, lo que ha beneficiado enormemente al proyecto.<\/p>\r\n<p><img class=\"aligncenter size-full wp-image-92180\" src=\"https:\/\/www.alj.com\/app\/uploads\/2021\/09\/Shuqaiq-3-Site.jpg\" alt=\"\" width=\"2560\" height=\"1707\" \/><\/p>\r\n<h2>En los \u00faltimos a\u00f1os los problemas medioambientales han ganado mucha importancia. \u00bfQu\u00e9 medidas se est\u00e1n tomando para minimizar el impacto medioambiental de Shuqaiq 3?<\/h2>\r\n<p>La optimizaci\u00f3n de la sostenibilidad de la planta est\u00e1 totalmente en l\u00ednea con los valores y la forma de hacer negocios de Almar Water Solutions. Queremos respetar el medioambiente en cada etapa, no solo durante la construcci\u00f3n, sino tambi\u00e9n durante el funcionamiento. Para lograrlo, hemos implementado una serie de medidas y tecnolog\u00edas. Por ejemplo, esta planta tiene una instalaci\u00f3n de tratamiento de lodos que trata todo el material que eliminamos del agua de mar durante la desalinizaci\u00f3n. No todas las plantas de desalinizaci\u00f3n tienen una instalaci\u00f3n como esta. Esto significa que todos los residuos que producimos son inocuos y no son perjudiciales para el medioambiente.<\/p>\r\n<p>El sistema de pigging que utilizamos para limpiar el interior de las tuber\u00edas tambi\u00e9n es respetuoso con el medioambiente. Se trata de un sistema de limpieza mec\u00e1nica, as\u00ed que evitamos usar productos qu\u00edmicos para limpiar las tuber\u00edas y la torre de toma, limitando al mismo tiempo la cantidad de hipoclorito que utilizamos.<\/p>\r\n<p>Por \u00faltimo, durante la fase de construcci\u00f3n estamos utilizando estrategias que son m\u00e1s respetuosas con el medioambiente marino. Por ejemplo, cuando enterramos las tuber\u00edas en el fondo del mar, eliminamos mucho barro. Sin embargo, en lugar de tirar este barro a otro lugar y alterar el ecosistema marino, utilizamos dragas para sacar este material del mar. Lo almacenamos, lo secamos y luego lo usamos para rellenar las zanjas de las tuber\u00edas, as\u00ed que b\u00e1sicamente lo volvemos a colocar en su lugar original. Del mismo modo, devolvemos la salmuera del agua desalinizada al mar en varios puntos a lo largo de una tuber\u00eda de 200\u00a0metros, por lo que se dispersa muy r\u00e1pidamente en el oc\u00e9ano y no sobrecarga un \u00e1rea en particular.<\/p>\r\n<p><iframe src=\"\/\/www.youtube.com\/embed\/KITq7UXrWQE\" width=\"560\" height=\"314\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\r\n<h2>Ha trabajado en proyectos anteriores de Almar. \u00bfC\u00f3mo se compara este con los dem\u00e1s?<\/h2>\r\n<p>A lo largo de mi carrera he trabajado en proyectos de Almar en otras ubicaciones y tambi\u00e9n en otros proyectos por todo el mundo. Cada uno es muy diferente y depende en gran medida de las circunstancias locales. Shuqaiq 3 es probablemente el m\u00e1s memorable, porque tuvimos que enfrentarnos a la complicaci\u00f3n a\u00f1adida que nos plante\u00f3 la pandemia de COVID-19, especialmente de marzo a septiembre de 2020. Hab\u00eda toques de queda, retrasos en los suministros, la gente no pod\u00eda viajar\u2026 Fue muy dif\u00edcil, pero estoy muy orgulloso de que hayamos capeado el temporal con \u00e9xito y de que el proyecto siguiera avanzando para cumplir con sus fechas clave. La pr\u00f3xima es la fecha de puesta en funcionamiento a finales de octubre de 2021 y estoy seguro de que lo lograremos.<\/p>"],"_content":[""],"_ame_cpe_post_policy":["{\"accessProtection\":{\"active\":\"replace\"}}"],"_edit_last":["22"],"_wpml_media_duplicate":["1"],"_wpml_media_featured":["1"],"_yoast_wpseo_content_score":["90"],"_yoast_wpseo_estimated-reading-time-minutes":["1"]},"_links":{"self":[{"href":"https:\/\/cms.alj3.clients.lemonhq.io\/es\/wp-json\/wp\/v2\/perspectives\/15015","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cms.alj3.clients.lemonhq.io\/es\/wp-json\/wp\/v2\/perspectives"}],"about":[{"href":"https:\/\/cms.alj3.clients.lemonhq.io\/es\/wp-json\/wp\/v2\/types\/perspectives"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cms.alj3.clients.lemonhq.io\/es\/wp-json\/wp\/v2\/media\/15008"}],"wp:attachment":[{"href":"https:\/\/cms.alj3.clients.lemonhq.io\/es\/wp-json\/wp\/v2\/media?parent=15015"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}